HomeMy WebLinkAbout2800.Oxford Terrace.cADDRESS M0. Mord Ter ace ADDITION East University 'lace
NAMES OF ORIGINAL AND SUBSEQUENT OWNERS
ADDRESS
A- 121- QUALITY PTG. CO. -DALLAS
LOT Section 7
Date When Consideration REMARKS AND PERMIT DATA
Acquired
Constructed or Moved on Lot -5-9-63 Permit No.I
Contract Price $ Date Released a t/
A$1 of units tata� irk w�2.L86279
Ransco= Inc. (under contract to Pia.
Caruth Byrd. Ltd.)
CORNER OR INSIDE LOT I FRONT
FEET
FRONT DEPTH I AREA I PRC I UNIT VALUE
FINISH Base-
ment
Hardwood Floors
Pine Floors
BATH ROOM
Tile Floor
Inlay Linoleum
Plastered
£htrk. and T.S.
Sealed and Pap.
Beaver Board
Plywood Panels
82.94-66
STORIES
REMARKS: l0 �7,, G'om� le I -P
�kx>)Qhen paid >n
SIGNED
BLocR Replat of S -.�I--5; all 7 & 9
VALUATION SUMMARY
1
CLASS
BASEMENT
BATH ROOM
-
_
1 -Story Dwlg.
2 -Story Dwlg.
Story and Half
1 -Story Duplex
?r.iStory Duplex
�—Apartment (✓
Hotel Apt.
Store Bldg.
Office Bldg
Shop Bldg.
Factory Bldg.
Garage Bldg.
Garage Home
Filling Sta.
Full�/
Half f r 0 n e
Laundry
Furnace
Built-in Tub
Leg Type Tub
Pedestal Lay.Wall Lay.
Tile Wainscoating
Plaster "
Sealed & Papered
—
HEATING
S. C. C. P.
Gas Move
Gas Steam
Furnace
Fireplace
Floor Heaters
Central
51 W & C ✓
KITCHEN
Built-in Cabinet J,
Tile Drain Ft.
Wood Drain
Tile Wainscoating
Keen Cement "
Sealed & Papered
CONSTRUCTION
DRIVEWAY
Runners
Solid Concrete
Gravel
Brick
b f -V
�-eneer v
Hollow Tile
Concrete Block
Steel Frame
Box Const.
OUT BUILDINGS
Single Garage
Double Garage
Servants' Qtrs.
No. Rooms—
Plumbing
1 -Story
2_Story
(Other Out building)
(Explain in Rem.)
— _
MISCELLANEOUS,
No. of Fireplaces—
—Cedar Closets
Book Cases
FOUNDATION
ROOMS Bas;- STORIES
ment 1 1 2 1 3
Solid Concrete `
Cone. Blocks
Wood Blocks
Windows..........
Inside Doors ..... .
Doors.....
Mill Work........
Mirror Doors......
S�tairway..........
Attic Fan ........
Living Room
_
CONSTRUCTION
Box
Frame
Hollow Tile
Concrete
Galy. Iron
Dining 99Outside
Kitchen—Veneer
Breakfast Rm.
EXTERIOR
Bedroom
Siding
Shingles
Stucco
Com. Brick
Face Brick
Stone ✓
Paper
Library
ROOF
Sun Parlor
Shingle
Slate
Tile
Tar and Gravel
Asbestos
Composition
— -
Storage Room
Attic
- - —
Office
Stores
ROOF
_
Bath Room C7
—
Shingle
Slate
Tile
Tar and Gravel
Galt'. Iron
Asbestos
CompostionShinS/e ✓
Pitch. .Y-3.......
WALLS
Shower Room
Siding
Shingle
Stucco
Galv. Iron
Sleeping Porch
---
Powder Room 8
Den 8
Total Rooms
Each Floor
A- 121- QUALITY PTG. CO. -DALLAS
LOT Section 7
Date When Consideration REMARKS AND PERMIT DATA
Acquired
Constructed or Moved on Lot -5-9-63 Permit No.I
Contract Price $ Date Released a t/
A$1 of units tata� irk w�2.L86279
Ransco= Inc. (under contract to Pia.
Caruth Byrd. Ltd.)
CORNER OR INSIDE LOT I FRONT
FEET
FRONT DEPTH I AREA I PRC I UNIT VALUE
FINISH Base-
ment
Hardwood Floors
Pine Floors
BATH ROOM
Tile Floor
Inlay Linoleum
Plastered
£htrk. and T.S.
Sealed and Pap.
Beaver Board
Plywood Panels
82.94-66
STORIES
REMARKS: l0 �7,, G'om� le I -P
�kx>)Qhen paid >n
SIGNED
BLocR Replat of S -.�I--5; all 7 & 9
VALUATION SUMMARY
1
1
Base Rate i' I Class
_ _
Total Calculated F'tage U
Perimeter --
Square Feet
1st Floor
2nd Floor 6171,
Porches & Mise.
S. C. C. P.
C. C. P. — %
C. S. at
ASSESSED VALUE
Year Ground Imp. Total
�. - C/o �D
�-�� 99G`
DATE � -/9--: � e