Loading...
HomeMy WebLinkAbout2921.University.cADDRESS 2921 Univ, Blvd. 35 %1 ADDITION Univ. Court _ NAMES OF ORIGINAL AND SUBSEQUENT OWNERS ADDRESS Date Whe Acquired Z) C_ e- G�� Brick Solid Concrete OUT BUILDINGS F me -Veneer r Gravel Single Garage Hollow Tile Double Garage Concrete Block Servants' Qtrs. Steel Frame FENCE No. Rooms— — Plumbing Box Const. Iron 1 -Story Plain Wood 2 -Story Ornamental Wood (Other Out building) -Old ain •n R m.) FOUNDATION Wire ROOMS Solid Concrete Brick or Stone Living Room Conc. Blocks CONSTRUCTION Wood Blocks Dining 19MISCELLANEOIIc, Box — Frame Kitchen No. of Fireplace —Vence Hollo Tile Breakfast Rm. EXTERIOR —Cedar Closets Con etc Book Cases Galv. Iron Bedroom Siding Library Shingles Windows. . ..... . Stucco ROOF Sun Parlor Com. Brick / Inside Doors....... Storage Room Face Brick Y Outside Doors..... Shingle Stone Mill Work........ Slate Attic Paper Tile Mirror Doors...... Tar a Gravel Office Stairway.......... Asb os Stores - Co position ROOF Attic Fan ... �... Bath Room Shingle ✓ WALLS Shower Room Slate +3 Sleeping Porch Tile Siding - Tar and Gravel Shingle Powder Room Galv. IronStucco — Galv. Ir n Den Asbestos Compostion 1�— — Total Rooms Pitch....... �i — Each Floor 2M 12-23-40—Vf- Base-( STORIES ment l l 2 1 3 l 4 1 5 949'o..: 0 "°""""'bema FEET rpTH FRONT CLAUS BASEMENT BATH ROOM Total 1 -Story Dwlg. Vol, 2 -Story Dwlg. Story and Half 1 -Story Duplex 2 -Story Duplex Apartment Hotel Apt. Store Bldg. Office Bldg Shop Bldg. Factory Bldg. Garage Bldg. Garage Home Filling Sta. Full Half Laundry Furnace Built-in Tub Leg Type Tub Pedestal Lay.Wall Lay. pIll Tile Wainscoating Plaster " Sealed & Papered 3 HEATING &529 Gas Stove Plor Gas Steam Furnace Fireplace Floor Heaters- Cen al j KITCHEN Built-in Cabinet/ Tile Drain i,'/ Ft. `good Drain Tile Wainscoating Keen Cement " Sealed & Papered CONSTRUCTION DRIVEWAY — e,' Runners Brick Solid Concrete OUT BUILDINGS F me -Veneer r Gravel Single Garage Hollow Tile Double Garage Concrete Block Servants' Qtrs. Steel Frame FENCE No. Rooms— — Plumbing Box Const. Iron 1 -Story Plain Wood 2 -Story Ornamental Wood (Other Out building) -Old ain •n R m.) FOUNDATION Wire ROOMS Solid Concrete Brick or Stone Living Room Conc. Blocks CONSTRUCTION Wood Blocks Dining 19MISCELLANEOIIc, Box — Frame Kitchen No. of Fireplace —Vence Hollo Tile Breakfast Rm. EXTERIOR —Cedar Closets Con etc Book Cases Galv. Iron Bedroom Siding Library Shingles Windows. . ..... . Stucco ROOF Sun Parlor Com. Brick / Inside Doors....... Storage Room Face Brick Y Outside Doors..... Shingle Stone Mill Work........ Slate Attic Paper Tile Mirror Doors...... Tar a Gravel Office Stairway.......... Asb os Stores - Co position ROOF Attic Fan ... �... Bath Room Shingle ✓ WALLS Shower Room Slate +3 Sleeping Porch Tile Siding - Tar and Gravel Shingle Powder Room Galv. IronStucco — Galv. Ir n Den Asbestos Compostion 1�— — Total Rooms Pitch....... �i — Each Floor 2M 12-23-40—Vf- Base-( STORIES ment l l 2 1 3 l 4 1 5 949'o..: 0 "°""""'bema CORNER OR INSWE L0'1 FEET rpTH FRONT Year Ground Imp. Total IMS 390 o2%33 3 /9..7 &529 'fl Do =� e,' 33.24 ,/9,C/0," CORNER OR INSWE L0'1 FEET rpTH FRONT Year Ground Imp. FINISH Base- ment Hardwood Floors Pine Floors BATH ROOM Tile Floor Inlay Linoleum Plain Linoleum KIND WALLS Plastered Ehtrk. and T.S. Sealed and Pap. Beaver Board Plywood Panels FRONT AREA UNITI VALUE PRICE STORIES PICTURE TAKEN3.. 1' 1,4A VALUATION SUMMARY r Base Rate 8 3 I Class? Total Calculated F'tage J 9 9 f Perimeter i i Square Feet 1st Floor 2nd Floor a 2tt ha,?j. 1I0 6P% Porches & Misc. S. C. C. P. nio % �aC. C. P. C. S. at 5 ASSESSED VALUE Year Ground Imp. Total IMS 390 o2%33 3 /9..7 &529 =� e,' 33.24 ,/9,C/0," f REMARKS: SIGNED DATE---