HomeMy WebLinkAbout4320.Stanford.aADDRESS 4 3 20 t: �tl f o ru � (A ADDITION iui e r' y 1("` 4 LOT RLOCIC 19
NAMES OF ORIGINAL AND SUBSEQUENT OWNERS ADDRESS Date When
Con.,:Ieration REMARKS AND PERMIT DATAAcquiVALUATION
L/"%� e" Constructed or Moved on Lot J — — 4 ,,mit No. 43 � Base Rate
Contract Price $ 0 V 0 J Date Released
Square Feet
i��� n. Yarbrough
MAIN BLDG.
BASEMENT
CLASS
BASEMENT
BATH ROO
—t
_
—
—
—
—
—
—
—
—
—
_
1 -Story Dwlg.
2 -Story Dwlg.
Story and Half
1 -Story Duplex
2 -Story Duplex
Apartment
Hotel Apt.
Store Bldg.
Office Bldg.
Shop Bldg.
Factory Bldg.
Garage Bldg.
Garage Home
Filling Sta.
Full
Half
Laundry
Furnace
01
Built-in Tub
Leg Type Tub
Pedestal Lay.
Wall Lay.
Tile wain;coating
Plaster "
Sealed & Papered
HEATIN
KITCHEN
Gas Stove
Gas Steam
Furnace
Fireplace \
Floor Heaters i
Built inTile Drai Ca inet
Wood Drain
Tile Wainscoatin
Been Cement "Sealed and Papered
DIiIVI?AYMISCIELLANEOUS
CONSTRUCTION
Hollow Tile
Concrete Block
Steel Frame
Box Const.
Runner
No.
of FireplacesGravel —Cedar Closets Book Cases
FENCE
OUT BUILDINGS
Iron
Plain Wood
Orna I od
Wire ,
Brick` one
Single Garage
Double Garag
Servants Qtrs.
No. Rooms --
Plumbing
1 -Story
2 -Story
(Other Out building)
Explain in Rem.)
FOUND TION
ROOMS
Concrete
Blocks
Living Room
COND. HOUSE
Dining "
EXTERIOR
Goo
Fair
Bad
Kitchen
Breakfast Rm.
CONSTRUCTION
Sidin g
Shingles
Stucco
•ossa Brie
Press Brick
Stone
Paper
Box
Fram
--Veneer
Hollow Tile
Concrete
Galv. Iron
Bedroom
HINT
Library
Goo
Fair
Bad
Sun Parlor
Storage Room
ROOF
Aft1°
R04
Slate
Sate
Tile
Tar and Gravel
Asbestos
Composition
Office
Shingle
Slate
'rile
Tar and Gravel
Galy. Iron
Asbestos
Composition
Condition:
Good
Fair
Bad
HOW OCCUPIED
Stores
Owner
Tenant
Vacan
Rent
Remarks:
Bath Room
Shower Room
Sleeping Porch
WA
r
II''
SidingW
Shingle
Stucco
Galy. Iron
Total Rooms
Each Floor
t Ai -2-18.39
I I I I I I I I I I I I
Base- I STORIES CORNER OR INSIDE LOT
ment 11 I 2 I 8 I 4 I b
FEET
FRONT
FRONT I DEPTH I AREA
I
I I I I (A
I I I Base- I STORIES
I I I I I FINISH ment 1 1,2 1 3 1 4
I I I I I Hardwood Floors
II Pine Floors
I l
BATH R00M I I I
I I I I Tile Floo
Inlay Linoleum I
Plain Linoleum
I I I I I I I I I I
I:IND WALLS I I I I
Plastered I I I I I
10
Shtrk. and T.S.
Sealed and Pap.
Beaver Board
Plywood Panels
5
LAUNDRY
ROOF
HEATING
BATH
PLUMBING
PORCHES
FLOORS
FINISH
BUILT-IN FEATURES
GARAGE
DRIVEWAY
FENCES
DEDUCTIONS
DEPRECIATION %
PICTURE TAKEN
TOTAL IMPROVEMENT
UNIT VALUE
PRICE I + TOTAL
LAND
VALUE
TOTAL 1, D
REMARKS:
SIGNED f DATE