HomeMy WebLinkAbout6621.Snider Plaza.aADDRESS 6621 Snider Plaza ADDITION C wnpus pit s. RC 2
NAMES OF ORIGINAL AND SUBSEQUENT OWNERS
ADDRESS
Date When Consideration
Acquired
l7/
LOT - o f 7
REMARKS AND PERMIT DATA
Constructed or Moved on Lot L•—IU-4' Permit No.
n..,,t,. f v, i; (a 14_. _ t')00 TIM. Released
H
BLOC;Tr
VALUATION SUMMARY
Base Rate I Class
Total Calculated F'tage
Perimeter
Square Feet
1st Floor /�(p
2nd Floor �0
Porches & Misc.
S. C. C. P.
C. C. P.
I C. S.
Apartment Sealed & Papered ASSESSED VALUE
Hotel Apt. HEATING—
OL
_�, � Store Bldg. � � Year Ground Imp.
r" Office Bldg Gas Stove KITCHEN
Shop Gas Steam q
Factory Bldg. Furnace Built-in Cabi t
Garage Bldg. Fireplace Tile Drain Ft. S ib 1 0
Z
Garage Home Floor Heaters Wood Drain
Filling Sta. entr 1Tile Wainseoating
Been Cement"
Sealed & Papered
CONSTRUCTION DRIVEWAY .
Runners r mw -
Brick
r
Solid Concrete OUT BUILDINGS 1
jai-,
Fe Gravel `
Vence Single Garage
H flow Tile ___ Double Garage 1
Concrete Block Servants' Qtrs. — I
Steel Frame MISCELLANEOUSS No. Rooms—
Plumbing
Box Const. 1 -Story
No. of Fireplaces— 2 -Story
—Cedar Closets
(Other Out building)
STORIES
CORNER OR INSIDE LOT
FOUNDATION
Book Cases
(Explain in Rem.)
ROOMS
Base-
ment 1 1 2 3 1 4 5
f
Solid Concrete
Windows.. • • •
Living Room
FEET
I
DEPTH
I AREA
CONSTRUCTION
Conc. Blocks
Inside Doors......
— „
Dining
FRONT
CLASS
1 -Story Dwlg.
2 -Story Dwlg.
Story and Half
1 -Story Duplex
2 -Story Duplex
BASEMENT
BATH ROOM
I
-
REMARKS:
1
Full
Half
Laundry
Furnace
Built-in Tab
Leg Type Tub
Pedestal Lav
Wull Lay.
Tile Wainsco ting
Plaster 1.
l7/
LOT - o f 7
REMARKS AND PERMIT DATA
Constructed or Moved on Lot L•—IU-4' Permit No.
n..,,t,. f v, i; (a 14_. _ t')00 TIM. Released
H
BLOC;Tr
VALUATION SUMMARY
Base Rate I Class
Total Calculated F'tage
Perimeter
Square Feet
1st Floor /�(p
2nd Floor �0
Porches & Misc.
S. C. C. P.
C. C. P.
I C. S.
Apartment Sealed & Papered ASSESSED VALUE
Hotel Apt. HEATING—
OL
_�, � Store Bldg. � � Year Ground Imp.
r" Office Bldg Gas Stove KITCHEN
Shop Gas Steam q
Factory Bldg. Furnace Built-in Cabi t
Garage Bldg. Fireplace Tile Drain Ft. S ib 1 0
Z
Garage Home Floor Heaters Wood Drain
Filling Sta. entr 1Tile Wainseoating
Been Cement"
Sealed & Papered
CONSTRUCTION DRIVEWAY .
Runners r mw -
Brick
r
Solid Concrete OUT BUILDINGS 1
jai-,
Fe Gravel `
Vence Single Garage
H flow Tile ___ Double Garage 1
Concrete Block Servants' Qtrs. — I
Steel Frame MISCELLANEOUSS No. Rooms—
Plumbing
Box Const. 1 -Story
No. of Fireplaces— 2 -Story
A- 121- QUALITY PTG. Co. -DALLAS
FRONT
PICTURE TAKEN
UNITI VALUE
PRICE
REMARKS: i f �D = y /p O
SIGNED
s
DATE
at
Total
796 0 11
��
—Cedar Closets
(Other Out building)
STORIES
CORNER OR INSIDE LOT
FOUNDATION
Book Cases
(Explain in Rem.)
ROOMS
Base-
ment 1 1 2 3 1 4 5
Solid Concrete
Windows.. • • •
Living Room
FEET
I
DEPTH
I AREA
CONSTRUCTION
Conc. Blocks
Inside Doors......
— „
Dining
FRONT
Wood Blocks
Outside Doors.....
Box
Frame
Kitchen
Mill Work........
—Veneer
Hollow Tile
Breakfast Rm.
Base- STORIES
EXTERIOR
Mirror Doors......
Concrete
—
Bedroom
FINISH
went
Stairway......... •
Gal,. Iron
Siding
Attic Fan ........
Library
Hardwood Floors
Shingles
Sun Parlor
Pine Floors
Stucco /
Com. Brick . /
ROOF
Storage Room
_
Face Brick VVV
Shingle
_
BATH ROOM
Stone
elate
Attic
Paper
Tile
Tar and Gravel
Office
Tile Floor
Asbestos
Inlay Linoleum
Composition
Steres
—
Plain Linoleum
ROOF
_
Bath Room
—
Shingle
WALLS
Shower Room
KIND WALLS
Slate
Sleeping Porch
Loll
Tile
Siding
Shingle
— ---
Powder Room
n—
Plastered —
Tar and Gravel
Stucco
Li
£htrk.and T.S.
_
Galv. Iron
Galv. Iron
Den
Sealed and Pan.
_
Asbestos
Beaver Board
Compostion
Total Rooms
Plywood Panels
Pitch...........1-4
Each Floor
i
A- 121- QUALITY PTG. Co. -DALLAS
FRONT
PICTURE TAKEN
UNITI VALUE
PRICE
REMARKS: i f �D = y /p O
SIGNED
s
DATE
at
Total
796 0 11
��