HomeMy WebLinkAbout3717.Purdue.b:g�ADDRESS—_ 3717_ _ -irdue � , I ADDITION
NAMES OF ORIGINAL AND SUBSEQUENT OWNERS
—a:--1 for d-
-v%to
OUT-BUILDINGS—
CLASS:
1
CLASS
BASEMENT
PLUMBING
Frame
Double Garage—
--
.YVeneer V
Hollow Tile
-
--
1 -Story Dwlg. V/
2 -Story Dw1g.
Story and Half
Full
Half
Laundry
Modern
Old Style
Sprinkler System
1 -Story Duplex
Furnace
---
Plain Wood
_
CONSTRUCTION
Box
Frame I/
Box Const.
2-Story Duplex
FOUNDATION
---
Blocks
-
MISCELLANEOUS
-Apartment
----
EXTERIOR
Siding
HEATING
Hotel Apt.
Fireplace v
Stucco
BASEMENT
-
Stove ✓
Gas Steam
Store Bldg.Gas
Office Bldg.
Shop Bldg.
Beamed Ceiling
Cupboards
Cedar Closets
----
---"
--
_
Factory Bldg.
Furnace
Bookcases
----
Su
Paper
Garage Bldg.
Fireplace
Tile Drains
----
Slate S
Tile A
Tar & Gravel O
Galv. Iron
ROOF
Garage Home
Shingle 1/
HOW OCCUPIED
----
Asbestos S
Owner
Tile
Filling Sta.
----
Tar and Gravel
Tenant
•
DRIVEWAY
CONSTRUCTION
Runners v1
Sold'Concrete
OUT-BUILDINGS—
CLASS:
Brick
Gravel
Single Garage
Frame
Double Garage—
--BLOCK __BLOCK
.YVeneer V
Hollow Tile
—
Garage & 1 —
Serv. Qtrs. J
FENCE
Concrete Block
Iron
—
Q
Steel Frame
Plain Wood
_
CONSTRUCTION
Box
Frame I/
Box Const.
Ornamental Wood
Wire
Prick or Stone
FOUNDATION
Concrete ✓
Blocks
—Veneer L
COND. HOUSE
Good {�
Fair
Hollow Tile
D
Concrete Block
Steel Frame K
EXTERIOR
Siding
Shingles
Bad
Galv. Iron B
Stucco
BASEMENT
-
B
Com. Brick
PAINT
--
Press Brick/
Good i/
ROOF L
Stone
J
Su
Paper
Fair
Shingle �/
_
Bad
Slate S
Tile A
Tar & Gravel O
Galv. Iron
ROOF
PLUMBING
Shingle 1/
HOW OCCUPIED
Slate
Asbestos S
Owner
Tile
1
Composition
Tar and Gravel
Tenant
•
Galv. Iron
Vacant
Asbestos
Rent
EXTERIOR
Composition
Remarks:
Siding %I
Condition :
Good d
Fair
Bad
Shingle
Stucco
Galv. Iron
ADDRESS
University Hts,
Date When
Acquired
-----fib
Consideration
Base- STORIES CORNER OR INSIDE LOT 1 2 I 3 4 FRONT
ROOMS ment JI -
1 F
de ��or th
wing Room ( FRONT UNIT
EET DEPTH AREA RICE _
Di
Itchen `o 140 7000, 0 00
reakfast Rm. Base- _ STORIES
edroom 3
- - — - — FINISH ment 1 2 3 14 b 600---
_ _ _ _
ibrary Hardwood Floors / -
— REMARKS
n Parlor _ _ Pine
torage Room _ Tile y _
ttic I _ Concrete _
ffice I Hardwood Finish
tores Pine
Paint
Plastered Walls
Shtrk. & T. S. ✓
Sealed & Pap. "
Total Rooms
Each Floor -�— SIGNED
-
PICTURE TAKEN
VALUE
DEDUCTIONS % y3
DEPRECIATION c/o
J
L
29
TOTAL IMPROVEMENT
TOTAL
--BLOCK __BLOCK
76-0) VALUE
REMARKS AND PERMIT D TA
VALUATION
Constructed or Moved on Lot 3 Permit No
Q
-0
Contract Price $ � V V Date Released (
']/(",
Base Rate IS
SquareI�'eet 16 9 ,3
r
MAIN BLDG.
BASEMENT
J
LAUNDRY
ROOF
J
HEATING
BATH
PLUMBING
1
PORCHES C c P
FLOORS
4
------
FINISH
BUILT-IN FEATURES
GARAGE
DRIVEWAY —
Base- STORIES CORNER OR INSIDE LOT 1 2 I 3 4 FRONT
ROOMS ment JI -
1 F
de ��or th
wing Room ( FRONT UNIT
EET DEPTH AREA RICE _
Di
Itchen `o 140 7000, 0 00
reakfast Rm. Base- _ STORIES
edroom 3
- - — - — FINISH ment 1 2 3 14 b 600---
_ _ _ _
ibrary Hardwood Floors / -
— REMARKS
n Parlor _ _ Pine
torage Room _ Tile y _
ttic I _ Concrete _
ffice I Hardwood Finish
tores Pine
Paint
Plastered Walls
Shtrk. & T. S. ✓
Sealed & Pap. "
Total Rooms
Each Floor -�— SIGNED
-
PICTURE TAKEN
VALUE
DEDUCTIONS % y3
DEPRECIATION c/o
O
TOTAL IMPROVEMENT
TOTAL
76-0) VALUE
TOTAL
I, i�
(0 x (00 Alm
DAT 2-
r