HomeMy WebLinkAbout4121.Purdue.bADDRESS 4121 Purdue C J ADDITION
NAMES OF ORIGINAL AND SUBSEQUENT OWNERS ADDRESS
CLASS
BASEMENT
PLUMBING
1 -Story Dwlg
Full
Modern
2 -Story Dwlg.
Half�
Old Style
Story and Half
Laundry
Sprinkler System
1 -Story Duplex
2 -Story Duplex
Furnace
.—Apartment
MISCELLANEOUS
Hotel Apt.
HEATING
Store Bldg.
Fireplace
Gas Stove
Beamed Ceiling
Office Bldg.
Gas Steam
Cupboards
-
Shop Bldg.
Factory Bldg.
Furnace%
Cedar Closets
Garage Bldg.
Fireplace
Bookcases
Garage Home
Isf ✓ -
Tile Drains
DRIVEWAY
Filling Sta.
CONSTRUCTION
Runners
Solid Concrete
OUT -BUILDINGS
CLASS:
Brick
r me
Gravel
Single Garage/
/ Veneer
Double Garage
FENCE
H low Tile
Garage &
Serv. Qtrs.
Iron
Concrete Block
Steel Frame
Plain W
Box Const.
"
Ornamenf!al ood
'
CONSTRUCTION
Wire
Box
Frame
ROOMS
FOUND ON
Brick or Stone
_
Concrete
Blocks
_ Veneer
Hollow Tile
Concrete Block
Steel Frame
COND. HOUSE
Living Room
EXTERIOR
Good
Fair
Dining
Kitchen
Siding
Breakfast Rm.
Shingles
Bad
Galv. Iron
Stucco/
----
Bedroom
PAI T
---
Library
Com. Brick✓
Press Brick
ROOF
Stone
Good
Sun Parlor
Shingle
Storage Room
Paper
Fair
Bad
Slate
Tile
Attic
ROO
Tar & Gravel
Galt'. Iron
Office
Shingle
HOW OCCUPIED
Stores
Owner
Bath
Slate
Asbestos
Tile
Tenant
Composition
Tar and Gravel
Shower
Vacant✓
Galva Iron
Asbestos
Rent
EXTERIOR
_
Siding
Composition
Remarks:
Condition:
Shingle
Good
Stucco
Fair
Galv. Iron
Total Rooms
Each Floor
Bad
Id levvild LOT 5
Date When Consideration REMARKS AND PZMIT DATA
Acquired
Constructed or Moved on Lot Z37Permit No.
Contract Price $ Date Released
"Ck » %4,174, �- r A-7nn
El
Base- STORIES
CORNER OR INSIDE LOT j FRONT
ment 1 2 3 4 S
FRONT DEPTH AREA PRI
FEET CE
�0 le 140 3400
FINISH Base- STORIES
ment 1 2 3 4 b
Hardwood Floors
Pine REMARKS:
Tile
Concrete "
Hardwood Finish
Pine
Paint "
Plastered Walls
Shtrk. & T.S. "
Ceiled & Pap.
PICTURE TAKEN
VALUE I +.
E
BLOCK 5
V A L U A T I O
Classification
3 Base Rate
Square Fee+. 13.
MAIN BLDG.
BASEMENT
LAUNDRY
ROOF
HEATING
BATH
PLUMBING
PORCHES C, -
FLOORS
FINISH
BUILT-IN FEATURES
GARAGE
DRIVEWAY
r
FENCES
DEDUCTIONS
DEPRECIATION %
TOTAL IMPROVEMENT -
TOTAL
LAND
VALUE
TOTAL F ,;4
3 Of
_DA