HomeMy WebLinkAbout4129.Purdue.b4 TlT1R F.CC
4129 Purdue !
NAMES OF ORIGINAL AND SUBSEQUENT OWNERS
7 1.3
DITION
ADDRESS
Iulewilu
LOT-
Date
OT 3
Dateced Consideration REMARKS AND PERMIT DATA
AcquConstructed or Moved on Loti 1 1rmit No.
Contract Price $ C 0 0. 0 0 Date Released
5 9A �
Base_ STORIES CORNER OR INSIDE LOT FRONT PICTURE TAKEN
ment 1 2 3 4 1 5
FRONT DEPTH AREA PRICE VALUE +
FEET140
FINISH Base- STORIES
ment 1 2 1 3 4 1 b
Hardwood Floors
Pine REMARKS:
Tile "
Concrete "
Hardwood Finish
Pine
Paint "
Plastered Walls
Shtrk. & T.S. "
Ceiled & Pap. "
1* 0
BLOCK
VALUATION
Classificatio
Base Rate -
Square Feet &92&2=z2tR25_
MAIN BLDG.
BASEMENT
LAUNDRY
ROOF
HEATING
BATH
PLUMBING
SCC P. !
PORCHES C G P. 2 8
FLOORS
FINISH
BUILT-IN FEATURES
GARAGE
DRIVEWAY
FENCES
DEDUCTIONS Z
0
DEPRECIATION %
TOTAL IMPROVEMENT Z`
TOTAL
LAND
VALUE
TOTAL 5(p4-0
Ufa 3 8 So
i H
S NED ItA
F
i
i
l
CLASS
BASEMENT
PLUMBING
,
t
1 -Story Dwlg.✓
Full
Modern✓
2 -Story Dwlg•
Half
Old Style
Story and Half
Laun
Sprinkler System
1 -Story Duplex
2 -Story Duplex
Fur ac
q _
Apartment
MISCELLANEOUS
Hotel Apt.
Store Bldg.
Office Bldg.
Shop Bldg.
HEATING
-
- -
Fireplace Ix
Beamed Ceiling
Cupboards
Gas Stove !i
Gas Steamy
Factory Bldg.
Furnaces '
Cedar Closets
Garage Bldg.
Garage Home
Fireplace � ' $,
1 P
Bookcases
ile Drains ✓
_
ch
DRIVEWAY
Filling Sta.
Ilk
COTRUCTION
Runners./,OUT-BUILDINGS
Solid Concrete
Gravel
- —"
B
F
ene r
CLASS:
Single Garage
Double Garage,,/
FENCE
Hollow Tile
Garage &
Serv. Qtrs.
Iron
Concrete Block
—
Steel Frame
Box Const.
B
Plain Wood
Orn ood
Wir
CONSTRUCTION
Box
Frame ✓
i
ROOMS
FOUNDATION
Brick or Stone
Concret
Blocks
_Veneer
Hollow Tile
Concrete Block
Steel Frame
Galv. Iron
COND. HOUSE
Living Room
--
EXTERIOR
Good✓
Fair
Bad
Dining "
Kitchen
Siding
Shingles
Breakfast Rm.
Bedroom
Stucco
-
PAINT
Library
Com. Brick,/
Good
Fair
ROOF
Sun Parlor
Press Brick
Stone
Paper
Shingle ✓
Storage Room
Bad
Slate
Tile
Tar & Gravel
Galv. Iron
Attic
ROOF
Office
—.
Shingle
HOW OCCUPIED
Stores
Owner
Tenant
/
Vacant/
Rent
Bath
Slate
Tile
Tar and Gravel
Galt'. Iron
Asbestos
Asbestos
Composition
Shower
EXTERIOR
Siding
Composition
Remarks:
Condition:
Shingle
Good
Stucco
Fair
Galv. Iron
Total Rooms
Each Floor
Bad
DITION
ADDRESS
Iulewilu
LOT-
Date
OT 3
Dateced Consideration REMARKS AND PERMIT DATA
AcquConstructed or Moved on Loti 1 1rmit No.
Contract Price $ C 0 0. 0 0 Date Released
5 9A �
Base_ STORIES CORNER OR INSIDE LOT FRONT PICTURE TAKEN
ment 1 2 3 4 1 5
FRONT DEPTH AREA PRICE VALUE +
FEET140
FINISH Base- STORIES
ment 1 2 1 3 4 1 b
Hardwood Floors
Pine REMARKS:
Tile "
Concrete "
Hardwood Finish
Pine
Paint "
Plastered Walls
Shtrk. & T.S. "
Ceiled & Pap. "
1* 0
BLOCK
VALUATION
Classificatio
Base Rate -
Square Feet &92&2=z2tR25_
MAIN BLDG.
BASEMENT
LAUNDRY
ROOF
HEATING
BATH
PLUMBING
SCC P. !
PORCHES C G P. 2 8
FLOORS
FINISH
BUILT-IN FEATURES
GARAGE
DRIVEWAY
FENCES
DEDUCTIONS Z
0
DEPRECIATION %
TOTAL IMPROVEMENT Z`
TOTAL
LAND
VALUE
TOTAL 5(p4-0
Ufa 3 8 So
i H
S NED ItA
F
i
i
l