HomeMy WebLinkAbout4216.Purdue.bADDRESS 4216 Purdue �� �� ADDITION
NAMES OF ORIGINAL AND SUBSEQUENT OWNERS I ADDRESS
,,moi . l j
Iu.lew1Ci
Date When I Consideration
LOT 15
REMARKS AND PERMIT IIAIA
Constructed or Moved on Lot 0 - it No.
Contract Price 1 • 0 Date Released
Blur: C. L. �owtll
Base- STORIES
1 �
VALUATION
CORNER OR INSIDE LOT
FRONT
CLASS
BASEMENT
PLUMBING
BASEMENT
1 -Story Dwlg.v
Full
Modern
2 -Story Dwlg.
Half
Old Style
Story and Half
Laund
Sprinkler System
1 -Story Duplex
/
6,400
GARAGE
2 -Story Duplex
Furn c
STORIES
Apartment
ment 1
2 3 4 1 5
MISCELLANEOUS
Hotel Apt.
HEATING
DEDUCTIONS
_
Store Bldg.
Fireplace
Tile "
Gas Stove
Beamed Ceiling
Office Bldg.
Shop Bldg.
Gas Steam
Cupboards
Pine
Factory Bldg.
Furnace
Cedar Closets
Garage Bldg.
Fireplace
Bookcases
Garage Home
8
Tile Drains
Ceiled & Pap.
DRIVEWAY
Filling Sta.
Runners
OUT -BUILDINGS
CONSTRUCTION
CLASS:
Solid Concrete
B ra
Gravel
Single Garage
Double Garage
FENCE
ene er
Hollow Tile
Garage &
Serv. Qtrs. I
Iron
Concrete Block
Steel Frame
Plain W o
Box Const.
Orna n ood
CONSTRUCTION
Wir J
FOUND ION
Br' or Stone
Box
ROOMS
Concrete***'Frame
Blocks
_ Veneer
Hollow Tile
COND. HOUSE
Living Room
- -
Dining "
EXTERIOR
Good
Concrete Block
Kitchen
Fair
Steel Frame
Siding
Shingles
Bad
Galv. Iron
Breakfast Rm.
Stucco
Bedroom
PAINT
—
Library
Com. Br' k
ROOF
Press c
Stone
Goo
Sun Parlor
Paper
Fair
Shingle✓
Storage Room
Bad
Slate
Tile
Attic
ROpi
Tar & Gravel
Galt'. Iron
Office
Shingle
HOW OCCUPIED
Stores
Owner
Bath
Slate
Asbestos
Tile
Tenant
Composition
Tar and Gravel
/
Shower
Galv. Iron
Vacant/
Asbestos
Rent
EXT RIOR
Sidin
Composition
Remarks:
Condition:
Shingle
Good
Stucco
Fair
Galv. Iron
Total Rooms
Floor
BadEach
,,moi . l j
Iu.lew1Ci
Date When I Consideration
LOT 15
REMARKS AND PERMIT IIAIA
Constructed or Moved on Lot 0 - it No.
Contract Price 1 • 0 Date Released
Blur: C. L. �owtll
Base- STORIES
VALUATION
CORNER OR INSIDE LOT
FRONT
PICTURE TAKEN
ment 1 2 3 4 5
2S
BASEMENT
FRONTDEPTH
AREA
VALUE
+
FEET
PORCHES
PRICE
FLOORS
60
140
6,400
GARAGE
I FINISH Base-
STORIES
FENCES
ment 1
2 3 4 1 5
Hardwood Floors
DEDUCTIONS
Pine "
DEPRECIATION %
REMARKS:
Tile "
Concrete "
Hardw-ood Finish
Pine
Paint "
Plastered Walls
Shtrk. & T.S. "
Ceiled & Pap.
•
b
BLOCK
VALUATION
Classification 'A
Base Rate—
at Square Feet ,
Square
MAIN BLDG.
2S
BASEMENT
LAUNDRY
ROOF
HEATING
BATH
PLUMBING
PORCHES
FLOORS
FINISH
BUILT-IN FEATURES
GARAGE
DRIVEWAY
FENCES
s
DEDUCTIONS
DEPRECIATION %
TOTAL IMPROVEMENT
TOTAL
LAND
VALUE
TOTAL opti,
� 1