HomeMy WebLinkAbout4509.Normandy.a16aq—Isr �je7-17)
POTOMAC PARK
ADDRESS— • NORMANDY � —_ ADDITION—_
NAMES OF ORIGINAL AND SUBSEQUENT OWNERS ADDRESS
CLASS
BASEMENT
BATH ROOM
1 -Story Dwlg.
Full
Built-in Tub
2 -Story Dwlg.
Half
Len Type Tub
Story and Half
Laundry
Pedestal Lav,
1-Story Duplex
Furnace
Wall Lay.Tile Wainscoati g
2 -Story Duplex
Gravel
— Plaster "
-.Apartment Z
Hollow Tile
Sealed & Papered
Hotel Apt.
HEATING
h9
Store Bldg.
Concrete Block
rvants' Qtrs.
Office Bldg
Gas Stove
KITCHEN
Shop Bldg.Gas
Steam
Factory Bldg.
Furnace
Built-in CaVFt
Garage Bldg.
Fireplace
Tile Drain
Garage Home
Floor Heaters
Wood Drain
Filling Sta.
Central
Tile Wainscoating
C P s f 4
Keen Cement "
Base- STORIES
Sealed & Papered
CONSTRUCTION
DRIVEWAY
------------------ -
Date When Consideration
Acquired
LOT l Z-0 0—f-3 ; —'+I' -5J'- E. 23 Of 6BLOC'K C
REMARKS AND PERMIT DATA VALUATION SUMMARY
Constructed or Moved on Lot 1()-8—&.7 Permit No -7371 �
Base Rate I Class
Contract Price $ 50* 000,()o Date Released Total Calculated F'tage
DLL Perimeter
1M "
FRONT
Solid ConcreteLiving Room
Conc. Blocks -- CONSTRUCTION _ _ — FEET DEPTH i AREA
FRONT
tif
Wood Blocks Dining " ISCELLANEOUc Box
Frame Kitchen t` 7
No. of Fireplace —Veneer 1- Y
Hollow Tile Breakfast Rm.
EXTERIOR —Cedar Closets Concrete FINISH Base- — STORIES
Book Cases Galv. Iron Bedroom 1 ment
Siding ) 51p Library Hardwood Floors _
Shingles Windows-- f . ..... --- ---_ _-- -- — _ - — —
Stucco ROOF Sun Parlor Pine Floors
Com. Brick Inside Doors....... --
Face Brick Outside Doors..... Shingle Storage Room -
-- --- - -
Stone Mill Work........ Slate Attic BATH ROOM
Paper
Tile - ----
_ -- -- --
Mirror Doors...... Tar and Gravel Office _ Tile Floor P
Asbestos ----
S'tairway.... Inlay Linoleum
Composition Stores
ROOF Attic Fan . ... ... _ Bath Room — Plain Linoleum —
Shingle --- WALLS Shower Room
SlateSleeping—PorchKIND WALLS
Tile � Siding
Tar and Gravel
Shingle Powder Room Plastered
--- _____
Galy. Iron
------- ------- Gt lvcoIron_ / Den - - £htrk. and T.S. —
�/ Sealed and Pap.
Asbestos
Compostion -- - --- — - —
Total Rooms Beaver Board
Pitch...... ------------_--- -- _ _-- Each Floor
Plywood Panels ---
2M 12- -40-VP
AOL
PICTURE TAKEN
UNIT
PRICE
1st Floor 40 ;� (P 6
,2nd Floor (0--A.(05
rches & Misc.
� v
S. C. C. P.
Brick
Runners-
Solid Concrete
- -
38 i i -
C. C. P. 6,
OUT BUILDINGS
F ame
—
Single Garage
=Veneer
Gravel
Hollow Tile
Ground
Double Garage
Total
h9
Concrete Block
rvants' Qtrs.
- -
FENCE
Steel Frame
No. Rooms—
Plumbing
-
L11
Iron
Box Const.
1 -Story
Plain Wood
Ornamental Wood
2-Story
(Other Out ding)
(Explain i em.)
C P s f 4
Base- STORIES
CORNER OR INSIDE LOT
FOUNDATION
Wire
Brick or Stone
tl AL
ROOMS ment 1 2 3 4 S
LOT l Z-0 0—f-3 ; —'+I' -5J'- E. 23 Of 6BLOC'K C
REMARKS AND PERMIT DATA VALUATION SUMMARY
Constructed or Moved on Lot 1()-8—&.7 Permit No -7371 �
Base Rate I Class
Contract Price $ 50* 000,()o Date Released Total Calculated F'tage
DLL Perimeter
1M "
FRONT
Solid ConcreteLiving Room
Conc. Blocks -- CONSTRUCTION _ _ — FEET DEPTH i AREA
FRONT
tif
Wood Blocks Dining " ISCELLANEOUc Box
Frame Kitchen t` 7
No. of Fireplace —Veneer 1- Y
Hollow Tile Breakfast Rm.
EXTERIOR —Cedar Closets Concrete FINISH Base- — STORIES
Book Cases Galv. Iron Bedroom 1 ment
Siding ) 51p Library Hardwood Floors _
Shingles Windows-- f . ..... --- ---_ _-- -- — _ - — —
Stucco ROOF Sun Parlor Pine Floors
Com. Brick Inside Doors....... --
Face Brick Outside Doors..... Shingle Storage Room -
-- --- - -
Stone Mill Work........ Slate Attic BATH ROOM
Paper
Tile - ----
_ -- -- --
Mirror Doors...... Tar and Gravel Office _ Tile Floor P
Asbestos ----
S'tairway.... Inlay Linoleum
Composition Stores
ROOF Attic Fan . ... ... _ Bath Room — Plain Linoleum —
Shingle --- WALLS Shower Room
SlateSleeping—PorchKIND WALLS
Tile � Siding
Tar and Gravel
Shingle Powder Room Plastered
--- _____
Galy. Iron
------- ------- Gt lvcoIron_ / Den - - £htrk. and T.S. —
�/ Sealed and Pap.
Asbestos
Compostion -- - --- — - —
Total Rooms Beaver Board
Pitch...... ------------_--- -- _ _-- Each Floor
Plywood Panels ---
2M 12- -40-VP
AOL
PICTURE TAKEN
UNIT
PRICE
1st Floor 40 ;� (P 6
,2nd Floor (0--A.(05
rches & Misc.
S. C. C. P.
— %
C. C. P. 6,
i' ?
— 5* o %
C. S,
at
ASSESSED VALUE
ear
Ground
Imp.
Total
h9
L11
) - ..
C== til AU-,, • /�fu 9 - 3 +7 � o .
0-�
SIGNED
DATE