HomeMy WebLinkAbout3232.Marquette.b.3.23-2
3232I'lar'aUniv. iIts.
uette -fir t
ADDRESS __- 1 -- ADDITION
„
NAMES OF ORIGINAL AND SUBSEQUENT OWNERS
ADDRESS
i
Date Wb
Acquire
REM j
Base- STORIES CORNER OR INSIDE LOT
ment 1 1 2 1 3 4 1 5
FEET DEPTH
- FRONT
FINISH3
_ Hardwood Floors
Pine Floors
BATH ROOM
Tile Floor
---- -- --- ---- ---- -- -
Inlay Linoleunl
--:._ T'.-.-1.......
Plastered
Shtrk. and T.S.
Sealed and Pap.
Beaver Board
Plywood Panels
FRONT I PICTURE TAKEN
AREA PRICE I VALUE 1
"MARKS:
SIGNED
BLOCK-
1N �
59
CLASS
BASEMENT
BATH ROOM
VALUATION SUMMARY,
1 -Story Dwlg.
Full
Built-in Tub
2 -Story Dwlg.
Half
Leg Type Tub
Square Feet
Story and Half
1 -Story Duplex
2 -Story Duplex
Laundry
Furnace
Pedestal Lay.
Wall Lav,Tile Wainscoating
Plaster "
8 06
_ —
Apartment
Sealed & Papered
-
HEATING
Hotel Apt.
Store Bldg.
Gas c'tove
KITCHEN
Office Bldg
Shop Bldg.
Gas Steam
Factory Bldg.
Furnace
Built-in Cabinet
Garage Bldg.
Garage Home
Filling Sta.
Fireplace
Floor Heaters..
Central
Tile Drain _ pt.
good Drain
Tile Wainscoating
-
--
_
Keen Cement "
Sealed & Papered
----
-
-
CONSTRUCTION
DRIVEWAY
- ---- -
Brick
Fme
Runners
Solid Concrete
OUT BUILDINerS
eneer
Gravel
Single Garage
Hollow Tile
Double Garage
- - —
Concrete Block
Servants' Qtrs.
-
FENCE
Steel Frame
Box Const.
No. Rooms -
Plumbing
1 -Story
Iron
Plain Wood
Ornamental Wood
Wire
2 -Story
(Other Out building)
(Explain in Rem.)
FOUNDATION
ROOMS
Solid Concrete
Cone. Blocks
B
rick or Stone
----- -
_
CONSTRUCTION
Living Room
MISCELLANEOUS.
to
Wood Blocks
BoxDining
Frame
-Veneer
Hollow Tile
Concrete
Galt'. Iron
Kitchen
No. of Fireplace
-Cedar Closets
Book Cases
Windows.. ..
Inside Doors.......
Outside Doors.....
EXTERIOR
Breakfast Rm.
_
Bedroom
Siding
Shingles
Stucco
Com. Brick /
Face Brick �/
Library
-
ROOF
Sun Parlor
- _
Shingle
Storage Room
Attic
Stone
Mill Work........
Slate
Paper
Mirror Doors......
Tile
Tar and Gravel
--- ---
Office
-- - _-_-- -
Stairway
trway ... :.....
Attic Fan .
Asbestos
Composition
----
Stores
ROOF
- __
Bath Room
Shingle
WAL14*
Shower Room
Slate
Tile
Sleeping Porch
_
Siding
Powder Room
Tar and Gravel
Shingle
--
--
Galv. Iron
Stucco
Galt'. Iron
---
Den
--
Asbestos
Total Rooms
Compostion--
- - - - ---
- -
Pitch........Rf
-_ __ -- ---
----__- --- __-
Each Floor
ADDRESS
i
Date Wb
Acquire
REM j
Base- STORIES CORNER OR INSIDE LOT
ment 1 1 2 1 3 4 1 5
FEET DEPTH
- FRONT
FINISH3
_ Hardwood Floors
Pine Floors
BATH ROOM
Tile Floor
---- -- --- ---- ---- -- -
Inlay Linoleunl
--:._ T'.-.-1.......
Plastered
Shtrk. and T.S.
Sealed and Pap.
Beaver Board
Plywood Panels
FRONT I PICTURE TAKEN
AREA PRICE I VALUE 1
"MARKS:
SIGNED
BLOCK-
1N �
59
4 < C. C. P. 3,? /a
C. S. at
VALUATION SUMMARY,
Base Rate
7 ? ( Class lr!
Total Calculated F'tage
Perimeter
Year
Square Feet
1st FloorL��y'`
Total
2nd Floor
8 06
'17
S. C. C. P.
4 < C. C. P. 3,? /a
C. S. at
ASSESSED
VALUE
Year
(`mound
Imp.
Total
J9 �9
8 06
'17
10e 7
377Z
DATE_
0