HomeMy WebLinkAbout3217.Lovers Lane.aADDITION-- JP_XQ4[_M_0__
NAMES OF ORIGINAL AND SUBSEQUENT OWNERS ADDRESS Date When
Acquired
Consideration
Concrete Block
Steel Frame FENCE No. Rooms
Plumbing
Box Const. Iron 1 -Story
Plain Wood 2 -Story
(Other Out building)
Ornamental Wood (Explain in Rem.) Base- STORI S_ CORNER OR
FOUNDATION Wire ROOMS ment 1 2 3 4
Brick or Stone
Solid Concrete CONSTRUCTION Living Room FEET
Cone. Blocks ;1100, FRONT
Wood Blocks Dining 0
MISCELLANEOUS� Box
Framee-o*� Kitchen
No. of Fireplaces -0 —Veneer 6 L
EXTERIOR —Gedar Closets Hollow Tile Breakfast Rm. FINISH
Book Cases Concrete Bedroom
Galv. Iron
Siding Library Hardwood FloorE
Shingles Windows. A!.� .... in, V1 —
Stucco Inside Doors ...... ROOF Sun rarlor no
Com. Brick storage Room
Face Brick Outside Doors ..... Shingle&O"� BATH ROOM
Stone Mill Work ........ Slate Attic
Paper Tile
Mirror Doors ...... Tar and Gravel Office Tile Floor
Asbestos Inlay Linoleum
Stairway .......... Composition Stores Plain Linoleum
ROOF Attic Fan ......... Bath Room
Shingle WALLS Shower Room
KIND WALLS
Slate Siding 00_*� Sleeping Porch
Tile Plastered
Tar and Gravel Shingle Powder Boom
Galv. Iron Stucco Ehtrk. and T.S.
Asbestos Galv. Iron Den Sealed ajid Pap.
Compostion Total Rooms Beaver Board
Pitch ....... Each Floor Plywood Panels
LO BLOCK xr-
REMARKS AND PERMIT DATA VALUATION SUMMARY
P rmit No. 496
Constructed or Moved on Lot 1?4- 7 73 Base Rate Class
Contract Price $ Date Released Total Calculated P'tage
Perimeter /�� 1
'76 '1`30,396; /A/.5r/. SQuare Feet
1st Floor 7 c1l
2nd Floor
Porches & Misc.
S. C. C. P.
C. C. P. 3
C. S. at
ASSESSED VALUE
SIGN ED -
DATE
CLAE'S
BASEMENT
13ATH ROOM
REMARKS:
1 -Story Dwlg.v""
Full
Built-in Tub
2 -Story Dwlg.
Half
Leg Type Tub
Story and Half
Laundry
Pedestal Lay.
I -Story Duplex
Furnace
Wall Lay.
Tile Wainscoating
2 -Story Duplex
Plaster
—Apartment
Sealed & Papered
HEATING
Hotel Apt.
Store Bldg.
Gas Stove $00*'
KITCHEN
Office Bldg
Shop' Bldg.
Gas Steam
Factory Bldg.
Furnace
Built-in Cabinet
_�/F
Garage Bldg.
Fireplace
Tile Drain t
0
Garage Home
Floor Heaters
Wood Drain
-1
Filling Sta.
Central
Tile Wainscoating
Keen Cement "
Sealed & Papered
CONSTRUCTION
DRIVEWAY
Runners
OUT BUILDINGS
Brick
krame%00-
Solid Concrete
Single Garage
—Veneer
Gravel
Hollow Tile
—
Double Garage
Concrete Block
Steel Frame FENCE No. Rooms
Plumbing
Box Const. Iron 1 -Story
Plain Wood 2 -Story
(Other Out building)
Ornamental Wood (Explain in Rem.) Base- STORI S_ CORNER OR
FOUNDATION Wire ROOMS ment 1 2 3 4
Brick or Stone
Solid Concrete CONSTRUCTION Living Room FEET
Cone. Blocks ;1100, FRONT
Wood Blocks Dining 0
MISCELLANEOUS� Box
Framee-o*� Kitchen
No. of Fireplaces -0 —Veneer 6 L
EXTERIOR —Gedar Closets Hollow Tile Breakfast Rm. FINISH
Book Cases Concrete Bedroom
Galv. Iron
Siding Library Hardwood FloorE
Shingles Windows. A!.� .... in, V1 —
Stucco Inside Doors ...... ROOF Sun rarlor no
Com. Brick storage Room
Face Brick Outside Doors ..... Shingle&O"� BATH ROOM
Stone Mill Work ........ Slate Attic
Paper Tile
Mirror Doors ...... Tar and Gravel Office Tile Floor
Asbestos Inlay Linoleum
Stairway .......... Composition Stores Plain Linoleum
ROOF Attic Fan ......... Bath Room
Shingle WALLS Shower Room
KIND WALLS
Slate Siding 00_*� Sleeping Porch
Tile Plastered
Tar and Gravel Shingle Powder Boom
Galv. Iron Stucco Ehtrk. and T.S.
Asbestos Galv. Iron Den Sealed ajid Pap.
Compostion Total Rooms Beaver Board
Pitch ....... Each Floor Plywood Panels
LO BLOCK xr-
REMARKS AND PERMIT DATA VALUATION SUMMARY
P rmit No. 496
Constructed or Moved on Lot 1?4- 7 73 Base Rate Class
Contract Price $ Date Released Total Calculated P'tage
Perimeter /�� 1
'76 '1`30,396; /A/.5r/. SQuare Feet
1st Floor 7 c1l
2nd Floor
Porches & Misc.
S. C. C. P.
C. C. P. 3
C. S. at
ASSESSED VALUE
SIGN ED -
DATE