HomeMy WebLinkAbout4102.5.Lovers Lane.aADDRESS 4102 Lovers ADDITION.
NAMES OF ORIGINAL AND SUBSEQUENT OWNERS
•
aIVMS -I=
(G)
Idlewild LOT W 15' of 11; E 10' of 12 BLOCK 1
Date When I Consideration
Acquired
REMARKS:
REMARKS AND PERMIT DATA VALUATION SUMMARY
Constructed or Moved on Lot Se 79 t Permit No. �
p 4 7 Base Rate ���0- I Class /,3 -'/
Contract Prices 759000 Date Released SLZ ,1p4fo Total Calculated F'tage 2S2
Scott Auger Day BUILDER Perimeter
Square Feet
let Floor /0 714
2nd Floor
Lef ar ra wil-,z 4;e'
Sre
-far
-7 6�d/CCNy a7p_N�y l CORNER OR INSIDE LOT FRONT
2 I 3 4 3
L'
PICTURE TAKEN
FEET FRONT DEPTH I AREA I PRICE I NIT VALUE I +.
� I ),qv I C-!�,,5bo � I
FINISHI Base- I STORIES I
ment 11 2 1 11 41 1
Hardwood Floors _
Pine Floors
BATH ROOM
Tile Floor
Inlay Linoleum
Plastered
Shirk. and T.S.
Sealed and Pap.
Beaver Board
Plywood Panels
REMARKS: 9L424)
SIGNED
%
C. C. P.
C. S. qce.d U ur f -a -42 at
ASSESSED VALUE
Year Ground Imp. Total
%9�-41 3, 254
195-1 3,76;-,0, .27.3b -S- L I3S
DATL
CLASS
BASEMENT
BATH ROOM
1 -Story Dw1g.
Full
Built-in Tutt
2 -Story Dwlg. ✓
Half
Leg Type Tub
Story and Half
1-Story
1 -Story Duplex
Duplex
Laundry
Furnace
`--�
Pedestal Lay.
Wall Lav✓
Tile Wainscoatin` A-
Plaster "
_.
Apartment
Sealed S Papered !--
HEATING
Hotel Apt.
Store Bldg.
Gas Stove
KITCHEN
Office Bldg
Shop Bldg.
Gas Steam
Built-in Cabinetr/-
Factory Bldg.
Furnace
Garage Bldg.
Garage Home
IXA
Fireplace
Floor Heaters
C jraa G
Tile Drain ____ Ft
Wood Drain
Tile Wainscoating
Keen Cement "
Sealed do Papered
DRIVEWAY
CONSTRUCTION
-
Brick
Frame
Runners
Solid Concrete---'
OUT BUILDINGS
Single Garage
�-Veneer
Gravel
Hollow Tile
Double Garage
Concrete Block
Servants' Qtrs.
MISCELLANEOUS
/
No. of Fireplaces -1
-Cedar Closets
Book Cases
Steel Frame
Boa Const.
No. Rooms -
Plumbing
1 -Story
2 -Story
(Other Out building)
(Explain in Rem.)
--
FOUNDATION
ROOMS
Solid Concrete ✓
Cone. BlocksCONSTRUCTION
Windows......... .
Inaido Doors......
Living Room
---- -
-
Box
od Blocks
Outside Doors.....
Dining tiW
Kitchen
- -^
Mill Work.......
Mirror Doors......
Stairway ..........
Frame
-Veneer
Hollow Tile
Concrete
Galv. Iron
EXTERIOR
Breakfast Rm.
Bedroom
Siding
Shingles
S
Attic Fan .......
-
-
Library -
Stucco
ROOF
Sun Parlor
Com. Brick /--
Face Brick ✓
Shingle
Storage Room
Attic
Stone
Slate
Paper
nle
Tar and Gravel
Asbestos
Composition
-- --
Office
--
-
Stores
ROOF
__-
Bath Room
- -
Shingle✓\vaOC)
WALLS
Shower Room
Slate
Tile
Siding
Sleeping Porch
- ----
Powder Room
--
Tar and Gravel
Shingle
Galv. Iron
Asbestos
Stucco
Galv. Iron
Den
Total Rooms
Compostion
Pitch...........
Each Floor
•
aIVMS -I=
(G)
Idlewild LOT W 15' of 11; E 10' of 12 BLOCK 1
Date When I Consideration
Acquired
REMARKS:
REMARKS AND PERMIT DATA VALUATION SUMMARY
Constructed or Moved on Lot Se 79 t Permit No. �
p 4 7 Base Rate ���0- I Class /,3 -'/
Contract Prices 759000 Date Released SLZ ,1p4fo Total Calculated F'tage 2S2
Scott Auger Day BUILDER Perimeter
Square Feet
let Floor /0 714
2nd Floor
Lef ar ra wil-,z 4;e'
Sre
-far
-7 6�d/CCNy a7p_N�y l CORNER OR INSIDE LOT FRONT
2 I 3 4 3
L'
PICTURE TAKEN
FEET FRONT DEPTH I AREA I PRICE I NIT VALUE I +.
� I ),qv I C-!�,,5bo � I
FINISHI Base- I STORIES I
ment 11 2 1 11 41 1
Hardwood Floors _
Pine Floors
BATH ROOM
Tile Floor
Inlay Linoleum
Plastered
Shirk. and T.S.
Sealed and Pap.
Beaver Board
Plywood Panels
REMARKS: 9L424)
SIGNED
%
C. C. P.
C. S. qce.d U ur f -a -42 at
ASSESSED VALUE
Year Ground Imp. Total
%9�-41 3, 254
195-1 3,76;-,0, .27.3b -S- L I3S
DATL