HomeMy WebLinkAbout3400.Hanover.aAcct. # - -5'#- Osco - X000 7
ADDRESS 3100 Hanover ADDITION University �ieights # 2 LOT 10
BLOCK 6
NAMES OF ORIGINAL AND SUBSEQUENT OWNERS
A -121 -QUALITY PTG. CO.—DALLAS
ADDRESS
Date When Consideration
Acquired
Base- STORIES CORNER OR
ment 1 1 2 3 1 4 S
FEET
FRONT
REMARKS AND PERMIT DATA VALUATION SUMMARY
Constructed or Moved on Lot Permit No. Base Rate „% o ff I Class
Contract Price $ , 000.00 Date Released �7e / 9 % 3 Total Calculated F'tage
M. I •Harris, Jr, Perimeter
- ---- -- -- --------- Square Feet
11)1✓' 1.()T I ��1i z�9liT
DEPTH I AREA I UNIT
PRICE
FINISH Base" STORIES
ment 11 1 2 1 3 1 4 1 5
Hardwood Floors
Pine Floors
BATH ROOM
Tile Floor _
Inlay Linoleum
I%I IN L n 1&11�
Plastered
Ehtrk. and T.S.
Sealed and Pap.
Beaver Board
Plywood Panels
PICTURE TAKEN
VALUE +
REMARKS:
33 X 1 9 FLO& F_ IED q77 I G
SIGNED
1st Floor 'Z� y SS
2nd Floor
Porches & Misc.
S. C. C. P. — %
C. C. P.
C. S. at
ASSESSED VALUE
Year Ground Imp. Total
/97 3 -- WIP0, me q -e
-L-
197t� l �o 2,:9-33e,I
DATE G , ? — Z3
CLASS
BASEMENT
BATH ROO*
1 -Story Dwlg. •
Full
Built-in Tu
2 -Story Dwlg.
Half
Leg Type Tub
Story and Half
1 -Story Duplex
Laundry
Furnace
Pedestal Lay.
Wall Lay.
Tile Wainscoating"
2 -Story Duplex
Plaster "
_—
Apartment
Scaled & Papered
HEATING
Hotel Apt.
Store Bldg.
Gas Stove
KITCHEN
Office Bldg
Shop Bldg.
Gas Steanl
Factory Bldg.
Furnace
Built-in Cabinet
Garage Bldg.
Garage Home
Filling Sta.
Fireplace
Floor Heater
Central
Tile Drain _ Ft
Wood Drain
Tile Wainscoatin
01
n _
Keen Cement "
Sealed & Papered
--
--
CONSTRUCTION
DRIVEWAY
Brick
Frame v
Runners
Solid Concrete
OUT BUILDINGS
Single Garage
Veneer
Gravel
—
Hollow Tile
Double Garage
-- _
Concrete Block
Servants' Qtrs.
-
MISCELLANEOUS
Steel Frame
Box Sonet.
No. Rooms Plumbing—
1 -Story
~.Story
(Other Out building)
(Explain in Renl.)
No. of Fireplacesl-
—Cedar Closets
Book Cases
FOUNDATION
ROOMS
Solid Concrete L'
Conc. Blocks
Windows......... .
Inside Doors......
CONSTRUCTIONLiving
Room
_
Box
Dining
Wood Blocks
Outside Doors.....
Kitchen—Veneer —
Mill Work........
Mirror Doors......
Stairway ......... •
Frame
Hollow Tile
Concrete
Galv. Iron
EXTERIOR
Breakfast >m.hpo
-- --
Bedroom
Siding
Shingles
Attic Fan .......
Library
_
—
Stucco
Com. Brick/
Face Brick ✓
ROOF
Sun Parlor
Shingle
Storage Room
Attic
Stone
Slate
Paper
Tile
Tar and Gravel
AsbestosC_
Composition
—
_
-- ----
Office
---
, L
ROOF
_
___8
Bath Room
Shingle
WALLS
Shower Room
Slate
Tile
Siding
Sleeping Porch
---
Powder Room
-
Tar and Gravel
Shingle
- --
Galv. Iron
Stucco
Galv. Iron
Den
Asbestos
Total Rooms
Compostion
Pitch...........
Each Floor
A -121 -QUALITY PTG. CO.—DALLAS
ADDRESS
Date When Consideration
Acquired
Base- STORIES CORNER OR
ment 1 1 2 3 1 4 S
FEET
FRONT
REMARKS AND PERMIT DATA VALUATION SUMMARY
Constructed or Moved on Lot Permit No. Base Rate „% o ff I Class
Contract Price $ , 000.00 Date Released �7e / 9 % 3 Total Calculated F'tage
M. I •Harris, Jr, Perimeter
- ---- -- -- --------- Square Feet
11)1✓' 1.()T I ��1i z�9liT
DEPTH I AREA I UNIT
PRICE
FINISH Base" STORIES
ment 11 1 2 1 3 1 4 1 5
Hardwood Floors
Pine Floors
BATH ROOM
Tile Floor _
Inlay Linoleum
I%I IN L n 1&11�
Plastered
Ehtrk. and T.S.
Sealed and Pap.
Beaver Board
Plywood Panels
PICTURE TAKEN
VALUE +
REMARKS:
33 X 1 9 FLO& F_ IED q77 I G
SIGNED
1st Floor 'Z� y SS
2nd Floor
Porches & Misc.
S. C. C. P. — %
C. C. P.
C. S. at
ASSESSED VALUE
Year Ground Imp. Total
/97 3 -- WIP0, me q -e
-L-
197t� l �o 2,:9-33e,I
DATE G , ? — Z3