Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAbout3435.Granada.bADDRESS' 3435 Granada ( ADDITION UrltV erg _X LOT____ 13 —BLOCK—___D
NAMES OF ORIGINAL AND SUBSEQUENT OWNERS ADDRESS Date When Consideration REMARKS AND PERMIT DATA VALUATION
Acquired /./
Constructed or Moved on Lot Permit No
• A •Adair 3711 Normandy Contract Price $ Date Released 1926 Base Rate—
--- --- ---- ---- - SquareFeet / b
CLASS
BASEMENT
PLUMBING
---I--_
FLOORS
---------
BUILT-IN FEATURES
GARAGE
DRIVEWAY
—'—
_--I
—__
—
1 -Story Dwlg.
Full
Modern
Old Style t�
----
—
--�
—
--
—
--
--j—
—
2 -Story Dwlg.
Story and Half
Half
Laundry
Sprinkler System
--
—
---
--
-
—
1 -Story Duplex ,,
2 -Story Duplex
Furnace
—
—
--
---
—
—i—
—
_Apartment
MISCELLANEOUS—
-------
-------
--
Hotel Apt.
HEATING
Fireplace
-----
Store Bldg.
Beamed Ceiling
------------
—
----
-----
—
—
---
—
Office Bldg.
Gas Stove
Cupboards
—
--
---
---
-----
—
--
Shop Bldg.
Gas Steam
Cedar Closets
--
4----
---
----
--
—
P`(
Factory Bldg.
Furnace
Bookcases
--
---------
--
Garage Bldg.
Fireplace
Tile Drains
--
-----------I--
—
--
Garage Home
� �
--
---------------
—
Filling Sta.
DRIVEWAY
—
--
--;
-----------
--
CONSTRUCTION
Runners
OUT -BUILDINGS
--
—
--------
�—
---
--
Sold Concrete
CLASS:
--
—
—
----
--
Brick Gravel Single Garage
r
——Frame—Double Garage—i
Veneer -- `-------I� / --
Hollow Tile FENCE Serv.g Qtrs. J -- -- -- — ` —
Concrete Block Iron -- — -- — — — — —
Steel Frame Plain Wood _
Box Const. Ornamental Wood ---- -----
CONSTRUCTION —i -- — I—i I-
-- Wire
FOUNDATION Bsse-
Box STORIES CORNER OR INSIDE LOT i I
Erick or Stone ROOMS
Concrete Frame ment 1 I 2 I 3 14 5
Blocks Veneer.r� — �— — FRONT DEPTH AREA
COND. HOUSE Hollow Tile Living Room — FEET
EXTERIOR Good Dining Z I_ —
Concrete Block 50 155 7750
Fair Steel Frame Kitchen i. _
Siding — STORIES
"hingles Bad Galv. Iron Breakfast Rm. - — FINISH Ba t 1 2 3 14
Stucco Bedroom
Com. Brick PAINT_
Library Hardwood Floors
Press Brick
Good ROOF
Stone Sun Parlor _I_ — Pine
Fair Shingle t/ —
Paper Bad Slate Storage Room __ — Tile
ROOF Tile Attic — Concrete —
Tar & Gravel Office _ _ Hardwood Finish _
Shingle HOW OCCUPIED Galv. Iron
Stores Pine _
Slate Owner Asbestos — — — —
2-
Tile Composition Paint
Tar and Gravel Tenant 61/— - - - ---�
VacantPlastered Walls
Galt'. Iron -- — —
Asbestos Rent EXTERIOR Shtrk. & T.S. "
Composition Remarks: Siding
Sealed &Pap.
Condition: q two Shingle -- -- —
Good •O Stucco —
Fair Galv.'Iron Total Rooms
Bad Each Floor
th
UNIT VALUE
PRICE
Ov C> U L>
b
REMARKS:
MAIN BLDG.
BASEMENT
LAUNDRY
ROOF
HEATING
BATH
PLUMBING
-
PORCHES y _8 _
' r Q
FLOORS
FINISH
BUILT-IN FEATURES
GARAGE
DRIVEWAY
FENCES
—
DEDUCTIONS
DEPRECIATION
O
TAKEN
/ TOTAL IMPROVEMENT
TOTAL 4
1 V U LAND
VALUE
TOTAL
h s 3(,(O A-
SIGNEI— DATE_
•