HomeMy WebLinkAbout6620.Golf Drive.aLIP rr0 4 -
ADDRESS' 6-M Golf Drive / ' ADDITION
NAMES OF ORIGINAL AND SUBSEQUENT OWNERS
CLASS
BASEMENT
PLUMBING
1 -Story Dwlg.
Full
Modern
2 -Story Dwlg.A/
Half
Old Style
Story and Half
Laundry
Sprinkler System
1 -Story Duplex
Furnace
2 -Story Duplex
DEDUCTIONS
-
-Apartment
MISCELLANEOUS
HEATING
Hotel Apt.
Fireplace
Gas Stove
Store Bldg.
Beamed Ceiling
Office Bldg.
Cupboards
Shop Bldg.
Gas Steam
Cedar Closets
Factory Bldg.
Furnace
Bookcases
Garage Bldg.
Fireplace
Tile Drains
Garage Home
REMARKS:
Filling Sta.
BASEMENT
DRIVEWAY
Runners
Sold Concrete
--
--
---
---
--
~�--
—
CONSTRUCTION
OUT -BUILDINGS
CLASS:
Brick
LAUNDRY
Gravel d
Single Garage
Frame
,Veneer�
NN—
.�
y.w ♦
1 _
Double Garage•
-
Hollow Tile
arage & 1 ✓
Serv. Qtrs. J
FENCE
Concrete Block
Iron
FLOORS
_
Steel Frame
Plain Wood
Lox Const.
Ornamental Wood
Wire
Brick or Stone
CONSTRUCTION
Box
Frame
FOUNDATION
Concrete
Blocks
—Veneer
COND. HOUSE
Good
Fair
—
Hollow Tile
Concrete Block
Steel Frame
EXTERIOR.
Siding
Shingles
Bad
Galv. Iron
Stucco
Com. Brick/,
PAINT
ROOF
Press Brick
Good
Stone
Shingle
Paper
Fair
Bad
Slate
Tile
Tar & Gravel
Galv. Iron
ROOF
Shingles
HOW OCCUPIED
Owner
Slat;
Asbestos
Tile
Composition
Tar and Gravel
Tenant
Galv. Iron
Vacant
EXTERIOR
Asbestos
Rent
Siding
Composition
Remarks:
Condition:
Shingle
Good i
Stucco ✓,
Fair
Galv. Iron
Bad
1
ROOMS
Living Room
Dining "
Kitchen
Breakfast Rm. -
Bedroom
Library
Sun Parlor
Storage Room
Attic
Office
Stores
Total Rooms
Each Floor
is
ADDRESS
Francis Daniel Par's §1 LOT_ -1 a nd 2 _ _
_ __BLOCK -2
:`,,... �a+�i� _• �',
I I IIii I
FINISH
GARAGE
Date When
Acquired
Consideration
I REMARKS AND PERMIT DATA
FENCES /7
VALUATION
TOTAL
Constructed e- "`- ^^ i -` g 2 I- 3 Permit No 1559
DEDUCTIONS
2
Base Rate - ' O
SquareFeet �O O
Contract Price $ 41000 Date Released
MAIN BLDG.
S
—
Hardwood Floors
(
-]—
--
REMARKS:
BASEMENT
--
--
---
---
--
~�--
_
Tile
LAUNDRY
ROOF
NN—
.�
y.w ♦
1 _
-------
HEATING
—
BATH -
PLUMBING
-
S
C C 7
PORCHES
-
FLOORS
FINISH
BUILT-IN FEATURES
---
---
---
---Ll
1
—L—
:`,,... �a+�i� _• �',
I I IIii I
FINISH
GARAGE
STORIES
DRIVEWAY
FENCES /7
TOTAL
..-- 4) go
DEDUCTIONS
DEPRECIATION
Base- STORIES CORNER OR INSIDE LOT FRONT PICTURE TAK
ment 1 I 2 I 3 II 4 5�o - / O- 3/t_
/ 5 TOTAL IMPROVEMENT
FRONT FEETDEPTH AREA PRICE UNIT VALUE TOTAL
-- — — 33.4 200 229380 VALUE r
r
Hardwood Finish
Pine
-- - —_ Paint
Plastered Walls
r Shtrk. & T.S. -
- Sealed & Pap. —
y
SIGNED- DATE- �-C-
•
•
1
—L—
FINISH
Base-
ment
STORIES
TOTAL
1 � 2
3 14
5
—
Hardwood Floors
(
-]—
--
REMARKS:
Pine
_
Tile
Concrete
r
Hardwood Finish
Pine
-- - —_ Paint
Plastered Walls
r Shtrk. & T.S. -
- Sealed & Pap. —
y
SIGNED- DATE- �-C-
•
•