HomeMy WebLinkAbout4029.Glenwick.a1� S 61?
ADDRESS 40 2 9 41 enwi ck Lane ADDITION— Troth s UW—.v--.-.-..Pk. Est
NAMES OF ORIGINAL AND SUBSEQUENT OWNERS ADDRESS Date
I When Consideration
Acquired
V1. B •.,),n d e r s an _ - --- --- -
Concrete
Blocks
CLASS
BASEMENT
PLUMBING
--
Living Room
1 -Story Dwlg.
Bull
Modern
2-Story Dwlg.
Story and Half
Half
Laundry
Old Style
Sprinkler System
--
__-
BASEMENT
1 -Story Duplex
Furnace
--
Library
ROOF
2-Story Duplex
Shingle
Slate
Tile
Tar & Gravel
Galv. Iron
Asbestos
Composition
Storage Room
—
—
HOW OCCUPIED
MISCELLANEOUS
_Apartment
---
HEATING
Hotel Apt.
Fireplace
Siding
Shingle
Stucco
Galv. Iron
Store Bldg.
Office Bldg.
Shop Bldg.
Gas Stove ✓
Gas Steam
Beamed Ceiling
Cupboards
Cedar Closets
---
Total Rooms
Each Floor
Factory Bldg.
Furnace
Bookcases
---
Garage Bldg.
Fireplace
Tile Drains
--
Garage Home ✓
---
—
Filling Sta.
---
_
DRIVEWAY
Runners
Sold Concrete ✓
CONSTRUCTION
-
OUT -BUILDINGS
CLASS:
Brick
Gravel
Single Garage
—
—
Frame
-0—Veneer
Hollow Tile
Double Garage
Garage & 1
Sere. Qtrs. J
---
---
---
FENCE
Concrete Block
Iron
---
Steel Frame
Plain Wood
rox Const.
Ornamental Wood
—
—
CONSTRUCTION
Wire
S
FOUNDATION
Box
Concrete
Blocks
Brick or tone
Frame
—Veneer
Hollow Tile
Concrete Block
Steol Frame
Galv. Iron
ROOMS
Constructed or Moved on Lot 10 2&rmit No 590
Living Room
GOND. HOUSE
food ✓
Fair
Bad
Dining "
EXTERIOR
Kitchen
Siding
shingles
Stucco
Com. Brick
Press Brick V/
Stone
Paper
Breakfast Rm.
Bedroom
BASEMENT
PAINT
Good'
Fair
Bad �/
LAUNDRY
Library
ROOF
Sun Parlor
Shingle
Slate
Tile
Tar & Gravel
Galv. Iron
Asbestos
Composition
Storage Room
_
ROOF
Shingle ✓
Slate
Tile
Tar and Gravel
Galv. Iron
Asbestos
Composition
Condition:
Good
Fair
Bad
Attic
HOW OCCUPIED
Office
Stores
Owner {/
Tenant
Vacant
Rent
Remarks:
FINISH
EXTERIOR
Siding
Shingle
Stucco
Galv. Iron
DRIVEWAY
FENCES
Total Rooms
Each Floor
•
LOT-- 25 ' o f 6 8-, 5 —_-BLOCK 15
PEMARKS AND PERMIT DATA
B VALUATION
Constructed or Moved on Lot 10 2&rmit No 590
Base Rate Z
SquareFeet_-—_1_1 8
Contract Price $ 2000 Date Released
MAIN BLDG.
t,00
-
BASEMENT
%
✓
E
LAUNDRY
ROOF
HEATING
BATH -
PLUMBING
PORCgES
FLOORS
FINISH
BUILT-IN FEATURES
GARAGE
DRIVEWAY
FENCES
DEDUCTIONS�j_ p
DEPRECIATION 1lo
Base- STORIES CORNER OR INSIDE LOT FRONT PICTURE TAKEN
ment 1 I 2 I 3 1 4 5 in si de no rth TOTAL IMPROVEMENT !11
_I_ ± FT
UNIT
FEETDEPTH AREA RICE VALUE
-- I TOTAL
LAND
75 235 / VALUE
Base- STORIES M
— FINISH 15 vV 1500 I TOTAL
Hardwood Floors
Pine "
Tile "
Concrete "
Hardwood Finish
Pine "
Paint "
Plastered Walls
Shtrk. & T.S. "
Sealed & Pap. "
•
ment 1 1 2 3 14 5
3I
REK ARKS :
— — SIGNED
rte_,
-13315
7
l=�
•