HomeMy WebLinkAbout3212.Daniels.aADDRESS 3212 Daniel 'rADDITION _ Proximo —LOT _ 7 RLO�I� A JZ
NAMES OF ORIGINAL AND SUBSEQUENT OWNERS ADDRESS Y` Date When Consideration REMARKS AND PERMIT DATA , VALUATION
911d
Constructed or Moved on Lot 8-1.2-4OPermit No. 4599 Base Bate �?`f
I ContTact Price $1(),000.00 ease
Date Released
Square Feet
Bldr: Robt. B. Slaughter
Cc F, + MAIN BLDG.
CLASS
BASEMENT
BATH ROOM
'
—
I
—
—
—
3a. -1
---
—
G.
—
—
--
4
—
-'
1 -Story Dwlg.
2 -Story Dwlg.
Story and Half
1 -Story Duplex
tory Duplex /
Apartment V
Hotel Apt.
Store Bldg.
Office Bldg.
Shop Bldg.
Factory Bldg.
Garage Bldg.
Garage Home
Filling Sts.
Full
Half Ineq
Laundry
Furnace
Built-in ee Tub
Pedestal
Wall Lave
Tile wainscoatin
Plaster
Sealed & Papered
I I
HEATING
KITCHEN
Gas Stove S
Gas Steam
Furnace M✓
Fireplace/
Floor Heater
Built in C net
Tile Drain -
Wood Drain
Tile Wainscoatin
Keen Cement "
Sealed and Papered
BATH ROOM
DRIVEWAY
MISQELLANEOUS
CONSTRUCTION
Runners
Solid Concrete
Bri
h' 0—Cedar
Veneer✓
Hollow Tile
Concrete Block
Steel Frame
Box Const.
No. of Fireplaces
Closets
Book Cases
Inlay Linoleum
I I I I
FENCE
OUT BUILDINGS
IronSingle
Plain Mo
Ornamental Wood
Wire
Brick
Brick or Stone
Garag
Double Garage
Servants Qtrs.
No. Rooms--
,(,�Q
1 -Story ✓Wding)Living
2-StoryBlocks (Other Out bEx
Explain in Rem.)
p
FOUNDATION
ROOMS
ment
Concrete
I I
Room
Shtrk. and T.S.
COND. HOUSE
Sealed and Pap.
Dining
Beaver Board
EXTERIOR
Good
Fair
Bad
Kitchen
CONSTRUCTION
Siding
Shingles
Stucco
Com. Brick
Press Brick
Stone
Paper
Breakfast Rm.
Box
Frame I/Bedroom
--Veneer
Hollow Tile
Concrete
Galt'. Iron
I
PAINT
Library
Good-/
Fair
Bad
Sun Parlor
Storage Room
Attic
ROOF
ROOF/
Shingle✓
Slate
Tile
Tar and Gravel
Asbestos
Composition
Office
Shingle
Slate
Tile
Tar and Gravel
Galt'. Iron
aly. r
AsbeComposition
Condition:
Good
Fair
Bad
HOW OCCUPIED
Stores
Owner
Tenant
Vacant
Rent
Remarks:
Bath Room
Shower Room
Sleeping Porch
WALLS
Siding✓
Shingle
Stucco
Galv. Iron
Total Rooms
Each Floor
—
1 M-2•tS-39
0
ES
1416
1 /
r
FEET I
DEPTH
I AREA
FRONT
J
3a. -1
-
Base- I STORIES
FINISH
ment I I 2 I 3 I 4 I 5
I I
Hardwood Floors
Pine Floors
BATH ROOM
I I
I I I
Tile Flo
I I
( I I
Inlay Linoleum
I I I I
Plain Linoleum
I I I
I
KIND WALLS
I
I I
I
Plastered
I I
I I !
Shtrk. and T.S.
Sealed and Pap.
Beaver Board
Plywood Panels
I I I I I
UNIT
PRICE
VALUE I +
REMARKS:
Kitchen Cabinet
Mill Work
Roof Pitch
Dressinp, Table
Outside Doors
Igside Doors
Windows
SIGNED
HEATING
BATH
PLUMBING
PORCHES 5
FLOORS
FINISH
BUILT-IN FEATURES
GARAGE
DRIVEWAY
FENCES
DEDUCTIONS
DEPRECIATION
TOTAL IMPROV
W)r 7
DL
ALUE
TOTAL
60
�0
Y
f
DATE &—,p 4"0
•