HomeMy WebLinkAbout3428.Daniels.aADDRESS 3428 Daniels l _-ADDITION
NAMES OF ORIGINAL AND SUBSEQUENT OWNERS
ADDRESS
Hursey
LOT 6 BLO(`.K 10
Date When Consideration l REMARKS AND PERMIT DATA VALUATION SUMMARY
Acquired X
Constructed or Moved on Lot 50 Permit No. 8964 Base Rate 3 "�-'� I Class � [�
Contract Price $ 15 OWs Date Released j
� Total Calculated F'tage
Horn -,Tc lin ConstoCoa Perimeter
3:� Z-%jr
Square Feet
lat Floor
2nd Floor
CLASS BASEMENT BATH ROOM z s7 ep'l-477 - - — - - -
•• T- QT Rs
1 -Story Dwlg. Full Built-in Tab
2 -Story Dwlg. Half Leg Type Tub
Story and Half Laundry Pedestal Lar. / '
1 -Story Duplex Furnace Nall Lay. N
Tile Wainscoating
2- tory Duplex Plaster "
Apartment Scaled & Papered
o e
Hl Apt. HEATING --- —
Store Bldg. _
Office Bldg Gas Stove ✓ KITCHEN
Shop Bldg. Gas Steam ---
Factory Bldg. Furnace Built-in Cabinet
Garage Bldg. Fireplace Tile Drain FtTi I
Garage Home Floor Heaters Wood Drain I IT7�
Filling Sta. Central Tile Wainscoating r 95J
Keen Cement "j
DRIVEWAY
OUT BUI7,DTNGS
Scaled & Papered
-- ---
CONSTRUCTION - -
Brick Runners - FF
e Solid Concrete _ _-
-Veneer Gravel n 1•
Hollow Tile —' Bee
Concrete Block Servantp Qtrs. 2.W
— No. �.-
_
Steel Frame MISCELLANEOUS Plumbiooms4/ ngi
Box Const.
No. of Fireplaces— *ory�
—Cedar Closets ((I'ther Out builtI )
Book Cases (Explain in R .) Bas;- STORIES CORNER OR INSIDE LOT FRONT PICTURE TAKEN
FOUNDATION ROOMS
{}— �, meat 1 2 3 4 S Z
Solid Concrete Windows. .. • 1 • • • . Living RoomNIT
Cone. Blocks Inside Doors CONSTRUCTION Z _y FRONT FEETDEPTH AREA I PRICE I VALUE I +
Wood Blocks Dining
Outside Doors..... Bos _ ___
Frame Hitchen Z y 53 I 146
Mill Work........ —Veneer -- ---- --- -
E%TERIOR Mirror Doors...... Hollow Tile Breakfast Rm. STORIES
Concrete FINISH Base-
C�tairway..... • • • • • Galy. Iron Bedroom �„ ment
Siding Attic Fan .... ... —_-- Library
•
Shingles Hardwood Floors REMARKS:
Stucco Sun Parlor Pine Floors
Com. Brick
Face Brick 1
Stone
Paper
Porches & Misc.
- - -- -
Room
S. C. C. P. ---
C. C. P.
Shingle oo�Storage
Slate
Tile
Tar and Gravel
Asbestos
Composition tion
— C. S.
ASSESSED VALUE
Year
Ground
I Imp.
- --
ROOF
ALL
--
Stores
-
Bath Room '„01,1
Shower Room
-
—
Shingle
Slate
Tile
Tar and Gravel
Gale. Iron
Asbestos f-
Compoetion 1�\
�/
WAL
HIND WALLS
Sleeping Porch
—
--
Siding
Shingle
Stucco
Galy. Iron
Plastered
Ehtrk. and T.S.
Sealed and Pan.
Beaver Board
plywood panels
Powder Room
—
Den
---
—
Total Rooms
Each Floor
_
--
Wood Blocks Dining
Outside Doors..... Bos _ ___
Frame Hitchen Z y 53 I 146
Mill Work........ —Veneer -- ---- --- -
E%TERIOR Mirror Doors...... Hollow Tile Breakfast Rm. STORIES
Concrete FINISH Base-
C�tairway..... • • • • • Galy. Iron Bedroom �„ ment
Siding Attic Fan .... ... —_-- Library
•
Shingles Hardwood Floors REMARKS:
Stucco Sun Parlor Pine Floors
Com. Brick
Face Brick 1
Stone
Paper
ROOF
- - -- -
Room
SIGNED DATEPitch......
Shingle oo�Storage
Slate
Tile
Tar and Gravel
Asbestos
Composition tion
—
BATH ROOM
Attic
--- --- - --
Office
Tile Floor
Inlay Linoleum
Plain Linoleum
--- -
- --
ROOF
—
--
Stores
-
Bath Room '„01,1
Shower Room
-
—
Shingle
Slate
Tile
Tar and Gravel
Gale. Iron
Asbestos f-
Compoetion 1�\
�/
WAL
HIND WALLS
Sleeping Porch
—
--
Siding
Shingle
Stucco
Galy. Iron
Plastered
Ehtrk. and T.S.
Sealed and Pan.
Beaver Board
plywood panels
Powder Room
—
Den
---
—
Total Rooms
Each Floor
_
--
- - -- -I -
A- 12 1 QUALITY PTG. CO.—DALLAS
r
10
at
Total