HomeMy WebLinkAbout2805.Fondren.a--� l Co
ADDRESS2805r ondreri L___— ADDITION
NAMES OF ORIGINAL AND SUBSEQUENT OWNERS
CLASS
BASEMENT
BATH ROOM
- --
--
-
1 -Story Dwlg.
Full
Built-in Tub
2 -Story Dwlg.
Story and Half
Half
L
Leg Type Tub
Pedestal Lay.
1 -Story Duplex
urnace
Wall Lay.
Tile Wainscoating
2 -Story Duplex
Plaster It
Apartment
Brick or Stone
Sealed &Papered
Hotel Apt.
HEATING
en.�%P
Store Bldg.
Double Garage4000000
. T�1��
Office Bldg
Gas Stove
KITCHEN
Shop Bldg.
Gas Steam
Built-in Cabinet
Factory Bldg.
Furnace
Steel Frame
Garage Bldg.
Fireplace
Tile Drain Ft.
Garage Home
Floor Heaters
_
Wood Drain
Filling Sta.
Central
Tile Wainscoating L
Iron
Keen Cement "
2 -Story
(Other Out building)
Sealed & Papered
CONSTRUCTION
DRIVEWAY
—
ADDRESS
Da n Ro
Date When Consideration
Acquired .y
LOT E-301 of 941.201 of 10 BLOCK B
REMARKS AND PERMIT DATA VALUATION SUMMARY
Permit No. r
Constructed or Moved on Lot 5-9- 51 �1} Base Rate -` I Class
Contract Price $ 31000.00 Date Released Total Calculated F'tage
Bldr : L. Smoot Perimeter 13 6
Square Feet %
- 1st Floor `7
2nd Floor
Porches & Misc.
S. C. C. P. .-D %
C. C. P.
C. S. at
ASSESSED VALUE
FOUNDATION(Explain
Runners
in Rem.)
- --
--
-
Brick
Solid Concrete
' Ci
ire
OUT BUILDINGS
F , ie
Gravel
__
Single Garage
Veneer
Brick or Stone
3
Hollow Tile
-
Double Garage4000000
Solid Concrete
Concrete Block
Servants' Qtrs.
— - - - - -- -
/
--
FENCE
Steel Frame
No. Rooms-
_
CONSTRUCTION
Box Const.
Plumbing
1-Story
- -
-
-
Iron
Ph
n mental Wood
2 -Story
(Other Out building)
---
Date When Consideration
Acquired .y
LOT E-301 of 941.201 of 10 BLOCK B
REMARKS AND PERMIT DATA VALUATION SUMMARY
Permit No. r
Constructed or Moved on Lot 5-9- 51 �1} Base Rate -` I Class
Contract Price $ 31000.00 Date Released Total Calculated F'tage
Bldr : L. Smoot Perimeter 13 6
Square Feet %
- 1st Floor `7
2nd Floor
Porches & Misc.
S. C. C. P. .-D %
C. C. P.
C. S. at
ASSESSED VALUE
FOUNDATION(Explain
in Rem.)
Base-
STORIES
CORNER OR INSIDE LOT
ire
ROOMS
ment
i 1 2 1 3 4
Brick or Stone
5
Solid Concrete
Living Room
/
FEET
Cone. Blocks
Wood Blocks
CONSTRUCTION
_
I _
FRONT
DEPTH AREA
MISCELLANEOUS.
BoxDenim-
---
FrameW/OOOF
/
_
Kitchen
--
/
50
127.5 6375
No. of Fireplaces-
-Veneer
-------
-
---
Hollow Tile
Breakfast Om.
STORIES
E%TERIOR
-Cedar Closets
Concrete
-
FINISH
Base-
Book Cases
Galv. Iron
Bedroom
ment
Siding
- -
Shingles
_
/�-----
--
Library
--
Hardwood Floors
StuccoQ
Windows.
ROOF
Sun Parlor
Pine Floors
-- —
-
Com. Brick
Inside Doors..
- -- -
-
Storage Room
Face Brick
Outside Doors' ..
Shingle
-
StoneMill
Work........
elate
Attie
BATH ROOM
Paper
Mirror Doors......
Tile
Tar and Gravel
---- ----
Office
-
Tile Floor
- -
-
Stairway..........
s estos
----------
Stores
Inlay Linoleum
_
ROOF
Attic Fan . ... ...
Composition
Bath Room
-
Plain Linoleum
- --
Shingle
WA L
Shower Room
- --- -
SlateSleeping
BIND WALLS
Porch
Tile
Siding
----- ---- .r -
-- --
- --
Tar and Gravel
Shingle
Powder Room
Plastered
Galv, Iron
Stucco
- ---- -
--
--
- -
Shtrk, and T.S.
--
-
Asbestos
Galv. Iron
Den -,
Sealed and Pap.
-
Compostion
Pitch. - �I A.
- - ---
--
Total Rooms
Each Floor
Beaver Board
Plywood Panels
- ---
- -
_.._ _ _ _ ___
_
SIGNED - --- - ---- - - ----DATE _ � —ITT