HomeMy WebLinkAbout3201.Colgate.aADDRESS 3201 Colgate ADDITION UniversityHeights `4 LOT 14 BLOCK
NAMES OF ORIGINAL AND SUBSEQUENT OWNERS ADDRESS Date When Consideration REMARKS AND PERMIT DATA VALUATION SUMMARY
Acquired
Constructed or Moved on Lot 8--7---], Permit No.9 9C
Base Rate I Class
Contract Price $12,000 Date Released >
Total Calculated F'tage
jfll�ti• �iOSa�1i�@ Perimeter % y
Square Feet
1st Floor
CLAS
BASEMENT
BATH ROOM
1 -Story Dwlg. ✓
Full
Built-in Tub 0-
2 -Story Dwlg.
2 -Story
Half
Leg Type Tub
Story and Half
Laundry
Pedestal Lay.
Brick
Frame
&f—Veneer✓
Hollow Tile
Concrete Block
Steel Frame
Box Const.
OUT BUILDINGS
Wall Lay. owl
1-Story Duplex
Furnace
Tile Wainscoating v
2 -Story Duplex
FOUNDATION
Plaster to
Apartment
Sealed & Papered
Living Room
_
Hotel Apt.
Store Bldg.
Office Bldg
Shop Bldg.
Factory Bldg.
Garage Bldg.
Garage Home
Filling Sta.
HEATING
FRONT
CIL
_
Gas Stove
Gas Steam
Furnace
Fireplace
Floor Heaters
Central ✓
KITCHEN
Built-in Cabinet r
Tile Drain ✓ Ft.
Wood Drain
Tile Wainscoating
Keen Cement "
Sealed & Papered
Base-
C. C. P.
CONSTRUCTION
DRIVEWAY
Runners
Solid Concrete
Gravel
—
Brick
Frame
&f—Veneer✓
Hollow Tile
Concrete Block
Steel Frame
Box Const.
OUT BUILDINGS
Single Garage
Double Garage ✓
Servants' Qtrs.
No. Rooms—
Plumbing
1 -Story
2 -Story
(Other Out building)
(Explain in Rem.)
- ___
MISCELLANEOIIS
No. of Fireplace
—Cedar Closets
Book Cases
FOUNDATION
ROOMS
Windows..........
Inside Doors.....
Outside Doors.....
Mill Work........
Mirror Doors......
Stairway ..........
Attic Fan .T ...
Solid Concrete ✓
Conc. Blocks
Wood Blocks
Living Room
_
CONSTRUCTION
—
Boa
Frame ✓
_Veneer
Hollow Tile
Concrete
Galy. Iron
Dining "
Kitchen
Breakfast Rm.
EXTERIOR
Bedroom
Siding
Shingles
Stucco
Com. Brick
Face Brick P"
Stone
Paper
Library
--
—
ROOF
Sun Parlor
Shingle
elate
Tile
Tar and Gravel
Asbestos
Composition
--
Storage Room
Attic
- -
Office
Stores
ROOK'
Bath Room
Shingle
Slate
Tile
Tar and Gravel
Galt'. Iron
Asbestos
Compostion j
Pitch .......X3 .
WALLS
Shower Room
Siding ./
Shingle
Stucco
Galy. Iron
Sleeping Porch
--
Powder Room
—
Den
Total Rooms
Each Floor
A- 12 1- QUALITY PTG. CO.—DALLAS
Base- I STORIES CORNER OR INSIDE LOT
went 11 I 2 I 3 I 4 I S
FEET I
DEPTH
FRONT
0
FINISH
Base-
C. C. P.
ment
Hardwood Floors
at
Pine Floors
Year
Ground
Imp.
BATH ROOM
Tile Floor
Inlay Linoleum
Plain Linoleum
KIND WALLS
Plastered
£htrk. and T.S.
Sealed and Pap.
Beaver Board
Plywood Panels
AREA
119,200
STORIES
FRONT I PICTURE TAKEN
UNIT VALUE
PRICE I I +
REMARKS:
SIGNED
c.
- 2nd Floor
Porches & Misc.
S. C. C. P.
C. C. P.
---- %
C. S. ; '
at
ASSESSED VALUE
Year
Ground
Imp.
Total
//Z,:
DATE
0 � 0 � � 0 � 0