Loading...
HomeMy WebLinkAbout3204.Centenary.b3 201 C entmiary J Univ. • Hts ADDRESS J _ ADDITION NAMES OF ORIGINAL AND SUBSEQUENT OWNERS—I ADDRESS Datc. Acs CONSTRUCTION DRIVEWAY Runners A -- Solid Concrete Gravel OUT BUILDINGS 5 Brick Fr a -Veneer Hollow Tile Concrete Block Steel Frame Box Const. Single Garage Double Garage Servants' Qtrs. No. Rooms— Plumbing 1 -Story 2 -Story (Other Out building) (Explain in Rem.) CLASS BASEMENT BATH ROOM DEPTH 1 -Story Dwlg, 2 -Story Dwlg. Story and Half 1 -Story Duplex 2 -Story Duplex Apartment Hotel Apt. Store Bldg. Office Bldg Shop Bldg. Factory Bldg. Garage Bldg. Garage Home Filling Sta. Full Half Laundry Furnace Built-in Tub Leg Type Tub Pedestal Lay. Wall Lay.Tile Wainscoating Plaster to Sealed & Papered Living Room HEATING 1st Floor fIgl%�L Gas Stove Gas Steam Furnace Fireplace Floor Heaters Central KITCHEN Built-in Cabinet Tile Drain V/ Fc. Wood Drain Tile Wainscoating Keen Cement " CONSTRUCTION DRIVEWAY Runners A -- Solid Concrete Gravel OUT BUILDINGS 5 Brick Fr a -Veneer Hollow Tile Concrete Block Steel Frame Box Const. Single Garage Double Garage Servants' Qtrs. No. Rooms— Plumbing 1 -Story 2 -Story (Other Out building) (Explain in Rem.) FENCE Iron Plain Wood Ornamental Wood Wire B rick or Stone DEPTH FOUNDATION Solid Concrete Conc. Blocks Wood Blocks ROOMS FRONT Living Room CONSTRUCTIO 1st Floor fIgl%�L Box Frame —Veneer Hollow Tile Concrete Galv. Iron Dining " - - MISCELLANEOUr, Kitchen No. of Fireplace —Cedar Closets Book Cases Windows... Inside Doors .......- Outside Doors..... Mill Work........ Mirror Doors...... Stairway.... Attic Fan .. ... EXTERIOR Breakfast Rm. Bedroom Siding Shingles Stucco Com. Brick „% Face Brick ✓ Stone Paper Library S. C. C. P. --h•Y % ROOF Sun Parlor Shingle elate Tile Tar and Gravel Asbestos Composition Storage Room Attic Office Stores ROOF Bath Room VALUE Shingle Slate Tile Tar and Gravel Galv. Iron Asbestos CompostionTotal Pitch....... Yk Year WALLS Shower Room Siding Shingle Stucco Galt'. Iron Sleeping Porch 00 47 0 Powder Room Den Rooms Each Floor 10 3 2M 12-2:3-40—VP r r v I M Fr N, �/'l j7 `� r y CSI IV Lam- TO R_ Base- STORIES CORNER OR INSIDE LOT ment 1 2 3 4 5 Base Rate 3 3 I Class FEET DEPTH ' r Perimeter FRONT Square Feet 1st Floor fIgl%�L D 2nd Floor Porches & Misc. FINISH Base- S. C. C. P. --h•Y % ment Hardwood Floors Pine Floors VALUE NIP Year Ground Imp. Total BATH ROOM 00 47 0 /9t� Tile Floor 10 3 Inlay Linoleum Plain Linoleum KIND WALLS — Plastered V - Shtrk. and T.S. Sealed and Pap. Beaver Board Plywood Panels IS -4 FRONT AREA I UNIT PRICE STORIES REMARKS: SIGNED BLOCK 60 VALUATION SUMMARY Base Rate 3 3 I Class Total Calculated F'tage r Perimeter Square Feet 1st Floor fIgl%�L 2nd Floor Porches & Misc. S. C. C. P. --h•Y % C. C. P. % C. S. at ASSESSED VALUE NIP Year Ground Imp. Total 1141 00 47 0 /9t� 3 2 ,5,30 PICTURE TAKEN VALUE I + x' C DATE