HomeMy WebLinkAbout3712.Bryn Mawr.aADDRESS 3712 Brim Mawr LA It i ADDITION Univ. Ht,s. =1�
NAMES OF ORIGINAL AND SUBSEQUENT OWNERS
ADDRESS
Date When I Consideration
Acquired
LOT BLOCK 0
REMARKS AND PERMIT DATA
Constructed or Moved,on Lot 12-31--L9 Permit No.
Contract
clPrice $ 16 * 00& Date
, ReleasedgaY
` /
T �
or b,41 ' L SC'C .2 '
VALUATION SUMMARY
Base Rate I Class
Total Calculated F'tage
O
1st Floor
2nd Floor
CLASS BASEMENT BATH ROOM
1 -Story Dwlg.ylr Full Built-in Tub Porches & Misc.
2 -Story Dwlg. Half Legape Tu S�
Story and Half Laundry Pedestal Lay.
1 -Story Duplex Furnace Wall Lay. Tile Wainscoating 1
2 -Story Duplex
_-
Plaster It\
----- -- —
Office
Tile Floor
Inlay Linoleum
Plain Linoleum
Apartment
SIGNED DATE
Sealed & Papered
- -
Stores
HEATING
Hotel Apt.
9�
Store Bldg.
Shower Room
-- - - -- - - -- -
SlateSleeping
Tile
Tar and Gravel
Galv. Iron
Asbestos
Compostion 1
Pitch ....... .1
Gas Stove
KITCHEN
Office Bldg
KIND WALLS
Shop Bldg.
Gas Steam
I
Powder Room
Factory Bldg.
Furnace
Built-in Cabin
\
Garage Bldg.
Fireplace /
Tile Drain Ft.
Garage Home
Floor Heater= /
- _
Wood Drain
.
Filling Sta.
e ntral -- vJ
Tile Wainscoating
,
Keen Cement
Sealed & Papered
_
I
CONSTRUCTION
DRIVEWAY
Brick
Runners
OUT BUILDINGS
Solid Concrete
G 1
�
F me
Veneer�
Gravel
1
i
Single Garage /
Hollow Tile
Double Garage/'
I
i
- _.
Concrete Block
Servants' Qtrs.
MISCELLANEOUi'
Steel Frame
No. Rooms---
�-
s
Plumbing
Box Const.
1 -Story
No. of Fireplaces4
—Cedar Closets
Book Cases
(Other Out building)
(Explain in Rem.)
FOUNDATION
Bim- STORIES
CORNER OR
Windows..........
ROOMS went i 2 3 4 5
Solid Concrete
Living Room
CONSTRUCTION
Conc. Blocks
Inside Doors ......
_
FEET
FRONT
Bos
Dining "
Wood Blocks
Outside Doors.....
Kitchen
74,6
Mill Work........
Frame
—Veneer
Square Feet
at
Total
Sc7
Mirror Doors..... Hollow Tile Breakfast STORIES
Concrete FINISH ast Rm. I
EXTERIOR . Base -
Stairway .......... Galy. Iron Bedroom went
Siding Attic Fan . A
Library
Shingles � � � � � Hardwood Floors REMARKS:
Stucco ROOF Sun Parlor Pine Floors Q. M ! S 0
Com. Brick /' -- - co r y
Face Brick Shingle Storage Room '
Stone
Slate Attic BATH ROOM J
Paper
Tile
Tar and Gravel
Asbestos
Composition
—
----- -- —
Office
Tile Floor
Inlay Linoleum
Plain Linoleum
—
SIGNED DATE
- --
- -
Stores
ROOF
Shingle
-
Bath Room
_
Shower Room
SlateSleeping
Tile
Tar and Gravel
Galv. Iron
Asbestos
Compostion 1
Pitch ....... .1
WA30,1-S
Porch
KIND WALLS
01
Siding600'
Shingle
Stucco
Galv.Sealed
Plastered
Shtrk. and T.S.
and Pap.
Beaver Board
Plywood Panels
Powder Room
-
--
Total Rooms
Each Floor
-
A- 121- QUALITY PTG. CO.—DALLAS r