HomeMy WebLinkAbout3229.Amherst.aADDRESS 3229 Amherst 3 1 " I ADDITION.
NAMES OF ORIGINAL AND SUBSEQUENT OWNERS
ADDRESS
Unive-sity Heights #1
Date When Consideration
Acquired
T,0T 7)
BLOCK E
REMARKS AND PERMIT DATA VALUATION SUMMARY
Constructed or Moved on Lot (j-7_56 Permit No. 12801 Base Rate 3 �6 I Class $
Contract Price $ 142 500 Date Released 8_23_5 6 Total Calculated F'tage 194-0
Ham; lton e;, McConnell Perimeter /913"
Square Feet
--Cedar Closets (Other Out building)
,
FOUNDATION
Book Cases (Explain in RemROOMS
.) Bas;- STORIES CORNER ORINSIDE LOT I FRONT I PICTURE TAKEN
ment 1 1 2 1 3 4 1 S
Solid Concrete V_ Windows ..........
Living Room FEETNIT
Cone. Blocks Inside Doors..... CONSTRUCTION _ FRONT I DEPTH I AREA I PRICE VALUE I +.
Wood Blocks — Dining
Outside Doors..... Box
Frame Kitchenr ��
Mill Work........ —Veneer 50 �_•, i I ( r1
000
B • kf R
1st Floor
2nd Floor
IPorches & Misc.
—
EgTERIOR . .
.
.
.
Mirror Doors.Hollow Tile sea as t M. I
Base- STORIES
Concrete FINISH
stairway......... • Galy. Iron Bedroom went
Siding Attic Fan ........ Library
Shingles __ Hardwood Floors — REMARKS:
Stucco ROOF Sun Parlor Pine Floors
S. C. C. P.Q — %
C. C. P. l8 — •S-/, %r
C. S. at
ASSESSED VALUE
Year Ground I IMP. Total
�y
om. II
Storage Room
CLASS
BASEMENT
BATH ROOM
3# o
^tm>
1 -Story Dwlg. ✓
2 -Story Dwlg.
Story and Half
1 -Story Duplex
2 -Story Duplex
Full
Half
Laundry
Furnace
Built-in Tub
Leg Type Tub
Pedestal Lay.
Wall Lay.
Tile Wainscoating
Plaster '•
—
Apartment
Scaled & Paperedr
Attic
HEATING
Hotel Apt.
Paper
�.
---
Office
Store Bldg.
Tile Floor r
Gas Stove
KITCHEN
Office Bldg
Stores
Shop Bldg.
Gas Steam
ROOF
—
Factory Bldg.
Furnace
Built-in Cabinet
e -
Garage Bldg.
Garage Home
Fireplace
Floor Heaters
Tile Drain Ft,
Wood Drain
a
Filling Sta.
Central ✓
S Y►l � - C
Tile Wainscoating
Keen Cement
Sealed & Papered
<o
h
-
0
�+
30 -o
{
L
KIND WALLS
CONSTRUCTION
DRIVEWAY
Runners
Solid Concrete
Gravel
—
Brick
Frame
45y- Veneer r/
OUT BUILDINGS
Single Garage
Hollow Tile
Double Garage
Tar and Gravel
_
Concrete Block
Servants' Qtrs.
— -
MISCELLANEOUS
Steel Frame
Box Con8t.1-Story
No. Rooms—
Plumbing
--
Den
-
No. of Fireplaces--L2-Story
--Cedar Closets (Other Out building)
,
FOUNDATION
Book Cases (Explain in RemROOMS
.) Bas;- STORIES CORNER ORINSIDE LOT I FRONT I PICTURE TAKEN
ment 1 1 2 1 3 4 1 S
Solid Concrete V_ Windows ..........
Living Room FEETNIT
Cone. Blocks Inside Doors..... CONSTRUCTION _ FRONT I DEPTH I AREA I PRICE VALUE I +.
Wood Blocks — Dining
Outside Doors..... Box
Frame Kitchenr ��
Mill Work........ —Veneer 50 �_•, i I ( r1
000
B • kf R
1st Floor
2nd Floor
IPorches & Misc.
—
EgTERIOR . .
.
.
.
Mirror Doors.Hollow Tile sea as t M. I
Base- STORIES
Concrete FINISH
stairway......... • Galy. Iron Bedroom went
Siding Attic Fan ........ Library
Shingles __ Hardwood Floors — REMARKS:
Stucco ROOF Sun Parlor Pine Floors
S. C. C. P.Q — %
C. C. P. l8 — •S-/, %r
C. S. at
ASSESSED VALUE
Year Ground I IMP. Total
�y
om. II
Storage Room
Face Brick ✓ -
Shingle
Stone
elate
Attic
BATH ROOM
Paper
Tile
Tar and Gravel
---
Office
—
Tile Floor r
Asbestos
Composition
Stores
Inlay Linoleum
ROOF
—
Bath Room--------
Plain Linoleum
Shingle ✓
WALLS
Shower Room
/
Slate
Sleeping Porch
KIND WALLS
Tile
Siding
Tar and Gravel
Shingle
Powder Room
Plastered
Galt'. Iron
Stucco
Galt'. Iron
--
Den
Shtrk. and T.S.
Asbestos
Sealed and Pap.
_
Compostion
�3...Each
Total Rooms
Beaver Board
Plywood Panels
01
- SIGNED
DATE � .Z 7- t`6"
Pitch .....
Floor
A- 121- QUALITY PTG. CO.—DALLAS
•
•