HomeMy WebLinkAbout3905.Amherst.aADDRESS y ADDITION
NAMES OF ORIGINAL AND SUBSEQUENT OWNERS ADDRESS
j n
LJ
Base-
ment
•
STORIES
T s� BLOCK
Date When Consideration REMARKS AND PERMIT DATA V A L U A T I O N
Acquired
Constructed or Moved on Lot �' mit No.
_ Classification
Contract Price $ T Date Released Base Rate—
Square Feet P 1342
MAIN BLDG.
BASEMENT
LAUNDRY
ROOF
HEATING +
BATH
PLUMBING —
3
PORCHES G. c , p. — C
7p'di:3�$'S9;
CLASS
BASEMENT
PLUMB G
1 -Story Dwlg.
Full
Modern
2 -Story Dwlg.
Half
Old Style
J
Story and Half
1 -Story Duplex
2 -Story Duplex
Laundry+
Furnace
Sprinkler System
—Apartment
Hotel Apt.
_
HEATING
MISCELLANEOUS
Fireplace
Beamed Ceiling
Cupboards
Store Bldg.
Office Bldg.
Shop Bldg.
_
Gas Stove
Gas Steam
Factory Bldg.
Furnace
Cedar Closets
CORNER OR INSIDE LOT
Garage Bldg.
Fireplace
Bookcases
Garage Home
..�,�
Tile Drains
DRIVEWAY
Filling Sta.
TOTAL IMPROVEMENT
CONSTRUCTION
FRONT FEETDEPTH
Runners
OUT -BUILDINGS
Br
Solid Concrete
CLASS
e
Gravel
Single Garage
Double Garage
enee
Hollow Tile
Garage &-
Serv. Qtrs.
FENCE
Iron
Concrete Block
LAND
VALUE
14
IV
Steel Frame
Box Const.
Plain Woo
d.
-
7000
rl
Ornam ood
CONSTRUCTION
Wire
FOUND TION
Brick or Stone
Box /
ROOMS
ConcreteV
Frame
Blocks
Veneer
—Veneer
COND.
Living Room
EXTERIOR
Hollow Tile
Concrete Block
Good
Dining "
Kitchen
Siding
Fair
Steel Frame
Breakfast Rm.
Shingles /
Bad
Galv. Iron
/d Stucco /
Bedroom
P INT
Library
Com. Brick
Good
ROOF
Sun Parlor
Press Brick
Stone
Shingle
Storage Room
Paper
Fair
Bad
Slate
Attic
RO
Tile
Tar & Gravel
Office
HOW OCCUPIED
Stores
Shingle
Galv. Iron
Owner
Tenant /
Bath
Slate
Tile
Tar and Gravel
Asbestos
Composition
Shower
Galv. Iron
Asbestos
Vacant v/
Rent
EXTER OR
/ b o I. e-6
Siding V
X174 7r C e
Composition
Remarks:
Condition:
Shingle
Good
Stucco
Fair
Galv. Iron
Total Rooms
Each Floor
• Bad
LJ
Base-
ment
•
STORIES
T s� BLOCK
Date When Consideration REMARKS AND PERMIT DATA V A L U A T I O N
Acquired
Constructed or Moved on Lot �' mit No.
_ Classification
Contract Price $ T Date Released Base Rate—
Square Feet P 1342
MAIN BLDG.
BASEMENT
LAUNDRY
ROOF
HEATING +
BATH
PLUMBING —
3
PORCHES G. c , p. — C
7p'di:3�$'S9;
Concrete
Hardwood Finish
Pine
Paint "
Plastered Walls
Shtrk. & T.S.
Ceiled & Pap. "
•
FA
i
--- - ---�
FLOORS
DEDUCTIONS f
FINISH
BUILT-IN FEATURES
GARAGE
CORNER OR INSIDE LOT
FRONT
PICTURE TAKEN
DRIVEWAY
j
..�,�
FENCES
TOTAL IMPROVEMENT
Concrete
Hardwood Finish
Pine
Paint "
Plastered Walls
Shtrk. & T.S.
Ceiled & Pap. "
•
FA
DEDUCTIONS f
��
DEPRECIATION %
CORNER OR INSIDE LOT
FRONT
PICTURE TAKEN
j
TOTAL IMPROVEMENT
FRONT FEETDEPTH
AREA
PUNIT
RICE
VALUE
+
TOTAL
LAND
VALUE
14
IV
—
1�0
7000
rl
FINISH Base-
ment
STORIES
/
TOTAL !
1
2 4 S
Hardwood Floors
iy 7 n •
Pine ..
REMARKS:
Tile
-7
Concrete
Hardwood Finish
Pine
Paint "
Plastered Walls
Shtrk. & T.S.
Ceiled & Pap. "
•
FA