Loading...
HomeMy WebLinkAboutOrdinance No. 06/34 TXU Transmission Line ORDINANCE NO. 06/34 AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF UNIVERSITY PARK, TEXAS, REQUESTING TXU ELECTRIC DELIVERY TO RELOCATE THE 138 KV TRANSMISSION LINE CONNECTING THE LOMO AL TO AND GREENVILLE SUBSTATIONS OUTSIDE OF THE CITY LIMITS DUE TO PUBLIC SAFETY CONCERNS AS OUTLINED BY THE TEXAS PUBLIC UTILITY COMMISSION SUBSTANATIVE RULES TO ELECTRIC SERVICE PROVIDERS, Sec. 25.101(c)(5)(F). WHEREAS, the City Council finds and determines that the eXIstmg TXU Electric Delivery Company 138 kV transmission line located within the city limits of the City of University Park connects the Greenville substation to the Lomo Alto substation, both of which are in Dallas; and WHEREAS, the 138 kV transmission line sits on wooden poles, approximately 47-60 feet in height, which have warped over time and are leaning into the Stanford- Amherst alley, Boedeker street right-of-way, and University-Daniel alley; and WHEREAS, the alley rights-of-ways in which the 138 kV transmission line is located are between ten feet (10') and fifteen feet (15') wide and are utilized by vehicle traffic, including sanitation crews, utility repair crews, tree trimmers, and residents; and WHEREAS, the City finds and determines that relocation, alteration, and reconstruction by removing the existing transmission line and installing in its stead a 138 kV transmission line between alternative substations such as the Bandera substation could cost less than other alternatives that have been discussed by TXU Electric Delivery, such as either rebuilding the transmission line in the same location but on higher poles made of steel with increased capacity or burying the line underground in the Stanford Street right-of-way; and WHEREAS, the City finds and determines that relocation, alteration, and reconstruction by removing the existing transmission line per the Public Utility Commission Substantive Rules to Electric Providers will increase the reliability of service; and WHEREAS, for the length of one block University Park Elementary School is within three hundred feet (300') ofthe transmission line; and WHEREAS, the City finds and determines that relocation, alteration, and reconstruction by removing the existing transmission line per the Public Utility Commission Substantive Rules to Electric Providers will improve the overall safety and well-being of residents abutting the line and City employees and other users of the Stanford-Amherst alley; NOW, THEREFORE Ord11847 BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF UNIVERSITY PARK, TEXAS; Section 1. The City requests that TXU relocate and remove the 138 kV transmission line from its current route connecting the Lomo Alto and Greenville substations outside ofthe city limits of University Park, and Section 2. That the City supports efforts undertaken by members of the University Park Residents in Action Committee (UPRIA) regarding the relocation of the transmission line, and Section 3. That this Ordinance shall take effect immediately upon its passage, as the law and Charter in such cases provide. DULY PASSED by the City Council of the City of University Park, Texas, on the 5th day of December, 2006. APPROVED AS TO FORM: APPROVED: CITY ATTORNEY (rld/12-01-06/ord11847) Ord11847